Category: Exploration and Development

Silver Wolf Mobilizes Drill Rig at Ana Maria

Silver Wolf has mobilized a diamond drill rig to begin a fully funded 3,000-metre, 13-hole drill program at its Ana Maria property in Durango, Mexico. The campaign uses AI-driven target mapping to refine drilling, will be done in two phases, and comes with new stock-option grants and a short digital marketing agreement.

Pacifica Silver Reports Additional Drill Results at Claudia with Multiple High-Grade Silver-Gold Intercepts at the Aguilareña Area

Pacifica Silver reported more assays from Phase I drilling at its 100%-owned Claudia Silver-Gold Project in Durango, Mexico, with several narrow, high-grade silver-gold intercepts in the Aguilareña area, including up to ~1,180 g/t Ag and 5.41 g/t Au over 0.55 m, and additional significant hits in multiple holes. These results extend known mineralized veins and support ongoing Phase II exploration.

EV Resources Produces First Antimony Ingots from Los Lirios Project

EV Resources announced production of its first antimony ingots from material at the Los Lirios Project in Oaxaca, Mexico, validating a simple, low-cost smelting pathway. The milestone supports its strategy to become a near-term North American antimony producer, with drilling, metallurgical testing, and plant refurbishment advancing

Kingsmen Resources Announces Exploration Plans for Las Coloradas and Almoloya Projects Following Fully Funded Financing

Kingsmen Resources plans step-out and deeper drilling at its Las Coloradas high-grade silver project and initial diamond drilling at the Almoloya gold-silver project in Chihuahua, Mexico, after closing a bought-deal financing that fully funds its 2026 exploration programs. Multiple large, largely untested targets remain at both properties, highlighting strong discovery potential.

Sierra Madre Provides Update on Production Expansion and Equipment Purchases at La Guitarra

Sierra Madre Gold and Silver is advancing a two-stage expansion at its La Guitarra silver-gold mine. The first phase will boost processing from 500 tpd to ~750–800 tpd, with equipment upgrades and purchases underway. A second phase aims for 1,200–1,500 tpd by Q3 2027. Work includes plant upgrades, tailings handling, crushers, mills, and expanded mining fleet.

Tocvan Announces Restart Of Exploration Drilling At The Gran Pilar Project South Block

Tocvan Ventures Corp. announced the restart of exploration drilling at the South Block of its Gran Pilar Gold-Silver Project in Sonora, Mexico. Targeting new high-priority zones from drone magnetics and geochemistry (up to 21.2 g/t Au, >2,000 g/t Ag). Up to 10,000m RC drilling planned; two holes completed. Follows strong 2025 intercepts like 19.4 g/t Au over 3.1m. Pilot Mine condemnation drilling finished.

All News