SilverCrest Confirms U/G High Grades at Santa Elena 11.6m @ 5.83 gpt Au and 232.5 gpt Ag Including 1.15m @ 21.7 gpt Au and 572 gpt Ag
SilverCrest Mines Inc. is pleased to announce results of further delineation underground drilling completed in Q4, 2013 at the Santa Elena Mine in Sonora, Mexico. Twenty two closely-spaced (est. 25 metres) underground drill holes, totaling 1,590 metres have been completed to better define underground resources and verify widths and grades for the first planned production stopes to be mined in 2014 (see table below and attached Figure: http://media3.marketwire.com/docs/svlfig0217.jpg). The results of all holes included in this news release will be part of a resource update scheduled to be completed in H2 2014.









