
Kootenay Intercepts 1,186 GPT Silver Over 4.6 Meters Within 112 GPT Silver Over 70.5 Meters at Columba Project, Mexico
Kootenay President & CEO, James McDonald, stated “We continue to be extremely pleased with the drill results from Columba. The 1,186 gpt silver intersection from hole CDH-20-082 intercepting the B Vein is the highest silver grade reported to date over widths greater than 4 meters.”















