Category: Exploration and Development

Capitan Silver Intersects 2,451 g/t Silver Equivalent over 1.5 Metres, within a Wider Zone of 684 g/t Silver Equivalent over 9.1 Metres at the Cruz De Plata Project

Capitan Silver reported very high-grade drill results at its Cruz de Plata project in Durango, Mexico, including an intersection of 2,451 g/t silver-equivalent over 1.5 m within a broader zone of 684 g/t AgEq over 9.1 m, highlighting expanding high-grade silver mineralization and ongoing diamond drilling to test and extend targets along the Jesús María trend.

Mammoth Identifies Draw Point Locations for Future Small-Scale Gold-Silver Mineral Extraction and Pilot Leach Testing at its Tenoriba Gold-Silver Property, Mexico

Mammoth Resources has pinpointed several high-grade “draw point” locations at its 100%-owned Tenoriba gold-silver project in Chihuahua, Mexico for small-scale extraction and pilot heap leach testing. Using surface and drill data, geologists identified targets with attractive near-surface grades. Next steps include field checking and metallurgical tests to assess recoveries and potential tonnage.

Mithril Lidar Study Reveals 1.5 Km Trend And Historic Mines At La Dura Gold-Silver Project, Durango, Mexico

Mithril Silver & Gold’s LiDAR survey at the La Dura gold-silver project in Durango, Mexico uncovered 18 historic mine shafts, 44 adits and 134 pits and revealed a 1.5 km × 300 m structural trend with repeated workings, defining a high-priority drill target. The study will be combined with aerial magnetics and mapping to refine exploration planning across La Dura and nearby Copalquin.

Oroco Commences Phase 2 Drilling

Oroco has started Phase 2 diamond drilling at its Santo Tomás copper project in northwestern Mexico to upgrade mineral resource classifications in the South Zone. The work follows recent financing and includes infill/confirmation drilling and complementary pre-feasibility study programs.

GoGold Advances the Development of their Los Ricos South Project

GoGold Resources is progressing its Los Ricos South Project in Jalisco, Mexico, moving into execution with detailed underground mine and plant designs, ordering long-lead equipment, and selecting a Mexican contractor. Key engineering work — including SART plant and tailings facilities — is well advanced, aiming to be “shovel ready” once permits are secured.

Axo Copper Provides Exploration Update and Initiates Drill Program at Recently Acquired San Antonio Project

Axo Copper began a multi-phase drill program at its recently acquired San Antonio gold project in Sonora, targeting resource expansion and new discoveries, with an initial ~25,000 m focused on the Sapuchi deposit and ~5,000 m on high-priority targets like El Tigre. At La Huerta (Jalisco), drilling continues to extend high-grade copper-silver mineralization, backed by recent assays.

All News