In this article, I’ll have a look at Torex Gold Resources (TORXF.PK), a near-term gold mine developer in the Guerrero Gold Belt in Mexico, approximately 180 km south of Mexico City. The company is planning to develop its 5Moz+ gold mine at the El Limon zone of its 29,000 hectare Morelos project. This project is expected to cost $675M and was originally planned to start production in Q1 2015. In this article, I’ll have a closer look at the El Limon Bankable Feasibility Study, run some numbers on the expected annual cash flow and talk about the risks, as Torex Gold needs to relocate a village. This will result in my investment thesis at the end of this article.