
Fabled Drills 68.6 meters of Continuous Silver Mineralization in Initial Drilling at Santa Maria
Peter J. Hawley, CEO and President remarks, “We are quite excited with the results from our first drill hole drilled to the east of the last underground workings and the exceptional wide intersection of 68.6 meters of continuous silver in shallow oxide mineralization.”














