Category: Exploration and Development

Soltoro Completes Magnetic Surveys at Tecolote and Quila Projects

Soltoro Ltd. has completed two separate ground magnetic geophysical surveys at its 100%-owned Tecolote and Quila projects. The surveys were conducted to better understand their structural settings with a view to defining gold targets for drilling. Recent geological compilations have identified a broad northwest-trending belt of gold-silver mining districts that includes Soltoro’s El Rayo, Tecolote and Quila Projects, Cayden Resources El Barqueno Project and Endeavour Silver’s San Sebastian Project.

Excellon resumes drilling at La Platosa

Excellon Resources Inc., Mexico’s highest grade silver producer, is pleased to report the resumption of diamond drilling at its 100%-owned La Platosa Mine located in Durango State, Mexico. Highlights of the ongoing exploration program include:

Excellon resumes drilling at La Platosa

Excellon Resources Inc., Mexico’s highest grade silver producer, is pleased to report the resumption of diamond drilling at its 100%-owned La Platosa Mine located in Durango State, Mexico. Highlights of the ongoing exploration program include:

Amarium Upgrades Infrastructure at Jovita

Amarium Technologies Inc. though its wholly owned subsidiary Amarium Minerals Inc., announces the company has initiated a infrastructure upgrade at the Jovita Mine to facilitate increased production. Upgrades of the roads and loading faculties have been planned for over a year, and are a requirement for the continued expansion of production at the Jovita Mine. The project is scheduled for completion within 90 days, and is budget at an estimated US$375,000. The Jovita Mine is located in Michoacán, Mexico, and has been recently expanded to an operational capacity of 200 tons per day.

Amarium Upgrades Infrastructure at Jovita

Amarium Technologies Inc. though its wholly owned subsidiary Amarium Minerals Inc., announces the company has initiated a infrastructure upgrade at the Jovita Mine to facilitate increased production. Upgrades of the roads and loading faculties have been planned for over a year, and are a requirement for the continued expansion of production at the Jovita Mine. The project is scheduled for completion within 90 days, and is budget at an estimated US$375,000. The Jovita Mine is located in Michoacán, Mexico, and has been recently expanded to an operational capacity of 200 tons per day.

All News