Category: Exploration and Development

Almadex Hits 414.36 Meters of 0.11% Copper and 0.16 g/t Gold Including 74.50 Meters of 0.19% Copper and 0.38 g/t Gold in Hole EC-16-13 and Provides El Cobre Project Overview and Target Discussion

J. Duane Poliquin, Chairman of Almaden, commented, “We started drilling again at the Norte zone to follow up an old hole that ended in important mineralisation. The Norte Zone has room to grow from the recently reported intersections. Nevertheless, the extensive geophysical and alteration work we have done in the past show this area to be an offshoot of a much bigger target which may represent the intrusive core of this large porphyry system. This untested bigger target along with the untested Villa Rica zone will be drilled in the weeks and months ahead. To that end, a new more powerful drill was recently built for the Company. It was shipped from Vancouver this week and should be in Mexico within two weeks.”

DynaResource, Inc. Reports October 2016 Gold Production and Results of Operations at San Jose de Gracia

DynaResource, Inc. is pleased to announce that Mineras de DynaResource S.A. de C.V., the 100% owned subsidiary of DynaUSA and the exclusive operator of the San Jose de Gràcia Property in northern Sinaloa, México, is reporting the delivery for sale, on October 31, 2016, of an approximate 550 Oz gold contained in concentrates (exact weights in gold and silver oz. to be determined at final settlement).

Minaurum Identifies New Bulk-Tonnage Silver Target at La Quintera

“Minas Nuevas represents the first of a number of drill targets that we are progressing to the drill stage at La Quintera,” stated Darrell Rader, President and CEO of Minaurum Gold. “Our exploration program has thus far delineated multiple high-grade silver targets and we expect to identify more as we complete the first systematic mapping and sampling program undertaken in this historic district.”

Minera Santa Rita, Subsidiaria de Alamos Gold Alcanza 3 Millones de Horas/Hombre Sin Accidentes

El pasado 31 de octubre, la Mina El Chanate, ubicada en el municipio de Altar, Sonora, logró el record de tres millones de horas-hombre sin accidentes incapacitantes; esto representa 667 días sin accidentes. Esta meta se ha cumplido gracias al compromiso y cultura de los colaboradores de Minera Santa Rita junto a sus contratistas Sinergia Obras Civiles y CAT Nuñez quienes mantienen el valor principal de la empresa que es “Llegar a casa seguro todos los días”.

Argonaut Gold Announces Receipt of Change in Use of Soil Permit and Construction Decision for its 100% Owned San Agustin Project|

Pete Dougherty, President & CEO stated: “With the receipt of the final major permit for San Agustin and an expected after-tax IRR of 50%, the board approved the construction of the project. We view San Agustin as a low-risk, high-return project where we are able to utilize numerous synergies with our nearby operating El Castillo mine. The El Castillo and San Agustin deposits are very similar geologically, as is the characterization of mineralization. This allows us to incorporate similar mining and processing procedures at San Agustin that we currently utilize at El Castillo.”

All News