Wolverine Advances Work On Los Venados Property
The field program currently underway will consist of geochemical rock and soil sampling, geological field mapping, and a 7.4 line-kilometer Induced Polarization geophysical survey. The IP survey will include 2 east-west lines between the existing IP data and the Mulatos mine boundary to the south (2,100 meters each) and one north-south line targeting the center of the felsic dome which has been identified. The primary objective of this field program is to further define drill targets with the anticipation of drilling in the first quarter of 2018.









