Category: Exploration and Development

Aloro Provides Los Venados Update

As part of the ongoing exploration follow-up, beginning 2017, a reconnaissance program of sampling, mapping and assaying was conducted within the property. The large area of these mineralized and partially brecciated showings define a rhyodacitic volcanic dome that is associated with high sulphidation style alteration have been confirmed to have anomalous gold, bismuth and molybdenum in rock. Several felsic dome/ silica breccia complexes have been located throughout the property.

Fresnillo plc y MAG Silver esperan resolución de la SCJN sobre derecho minero

“Definitivamente, como lo manifestamos en su momento, no estamos de acuerdo con el impuesto ecológico, así lo manifestamos al Congreso del estado y al gobierno del estado. Ese proceso está en instancias judiciales, tenemos una impugnación del gobierno federal y será el tribunal de justicia quien resuelva”, dijo Octavio Alvídrez Ortega, director general de la empresa Fresnillo plc, en mayo pasado.

SilverCrest Intercepts 1.8 Metres @ 2,350 gpt AgEq in Granaditas Vein; Delineates High-Grade Footprint Averaging 1.5 Metres @ 1,022 gpt AgEq

N. Eric Fier, CPG, P.Eng and CEO, remarked, “With this confirmed discovery of continuous high-grade mineralization in the Granaditas Vein, we continue to increase our near-surface high-grade footprint in the district. In early 2017, the Company received from a local rancher a historic map showing the location of the Granaditas Mine that was operated by the Spanish in the early 1800’s. Up until receipt of the map, the location of the mine was unknown and documented as a lost Spanish mine. Historic reports show that approximately 3 million ounces of silver were mined from the Granaditas Vein to a depth of 90 feet where water was encountered. SilverCrest drilled below this depth and intercepted high-grade mineralization using the same geologic controls as other high-grade veins in the district. It is our intention to further drill test the Granaditas, Babicanora Norte, Babicanora, Babi Sur, Luigi and other veins during the next couple of months and include the results in the proposed updated resource planned for Q3 2018.”

Azure Minerals Ltd. – Continued Improvements in Oposura Metallurgy

In several parts of the Oposura mineralised system, thick mineralised intersections comprise narrow bands of very high-grade mineralisation separated by intervals of lower grade or waste material. Azure’s studies indicate that some of these thick mineralised zones may be more suitable to a “bulk” mining approach rather than “selective” mining, thereby reducing unit operating costs and maximising resource recovery.

Starcore Completes Review Period on Santa Fe Project

Starcore International Mines Ltd. (TSX:SAM) announces that it has completed its due diligence and review of the Santa Fe Project in Sinaloa, Mexico and will not be proceeding with the proposed acquisition, subject of the Letter of Intent entered into in November, 2017. The Company has given notice to the property owners of its disengagement from the project and Starcore has no further obligations on Santa Fe.

Mexus begins mining at the 8 Brothers/370 gold project

Mexus Gold US (OTCQB: MXSG) announced today that it has begun mining at the 8 Brothers/370 mining project. The company has mined 1000 tons of material containing an average of 9 grams Au and 50 grams Ag per ton. This material is currently being run through a crushing system and placed into an aerated VAT holding tank. The loading of the VAT, which has a 100 ton capacity, is expected to be completed by Wednesday, June 13th. The leaching time for this material will be 48 to 72 hours. Mexus has installed and successfully tested its portable Merrill Crowe gold recovery system. Running of the pregnant solution through this system will produce a concentrate which will be shipped to the U.S. to be refined and sold.

Minera Niega Desalojo de Habitantes de El Cedro

“Tuve una reunión con gente de la empresa Fresnillo, me comentan que hubo un platica que se tuvo hace semanas con la delegada y con habitantes de El Cedro, y simplemente él quiere aclarar que ellos de acuerdo al portal de transparencia de la Secretaría de Transparencia del Gobierno de la República, tienen un permiso de explotación de la minería en ese lugar, en donde bajo ningún motivo hay el desplazamiento de quienes viven en ese lugar, hubo una plática más no afirmaron”.

Avino Commissions Mill Circuit 4

“With our current expansion nearly complete at the Avino property, we are very excited to add Mill Circuit 4 to our production profile. The new state of the art circuit effectively increases our throughput capacity by 70%, and we expect it to be online full time in early January 2019” said David Wolfin, President and CEO. “I would like to thank our team in Mexico for their hard work, dedication and resourcefulness to get this major project completed.”

Busca Alcalde Dialogar con Minera para Evitar Desalojo

Esto luego de que habitantes de El Cedro denunciaron que al parecer la empresa minera Fresnillo PLC, encargada de los trabajos en la mina Las Torres, pretende desalojarlos para explorar los minerales que hay debajo de las viviendas, por lo que solicitaron ayuda de las autoridades municipales para evitarlo.

All News