
Mina Barimont Cierra Temporalmente
Al considerarse la suya una actividad no esencial acatarán el decreto emitido por el Gobierno de Sonora por emergencia sanitaria.

Al considerarse la suya una actividad no esencial acatarán el decreto emitido por el Gobierno de Sonora por emergencia sanitaria.
Evrim Resources Corp. is pleased to announce an update to the gold-silver resource on the Ermitaño Project in Sonora, Mexico. Property owner First Majestic Silver Corp. announced a 15% increase in grade and a 345% increase in contained silver-equivalent ounces in the indicated resource for year-end 2019 compared to the 2018 indicated resource.

“Our team at Parral has successfully adapted agglomerated heap leaching to old mined waste at Parral, and the SART is a further optimization of this innovation. The operation produces low cost gold and silver ounces while providing environmental remediation for the town of Parral. We see this expertise which we’ve developed over the last 6 years of operation as a real asset to the Company that may be applicable to the millions of tonnes of mined waste in Mexico and beyond,” said Brad Langille, President and CEO.

Igor Gonzales, President and CEO of Sierra Metals Inc. commented: “We are excited about the significant increase in Bolivar’s mineral resources from additional work completed in the past three months, since our year-end 2019 mineral resource update.

TMC Exploration has been retained to undertake the multiple-task geophysical survey. Work has begun as of March 21. The results will be combined with multiple other distinct surveys.

Phase II drilling has advanced steadily since November 2019 and now totals 24 holes for a cumulative 6,955 metres. At this point, the Company has decided to pause drilling until a time where it feels it is safe and appropriate to resume amid the COVID-19 global pandemic. Drilling activities have ceased, core splitting and sampling of final holes was completed late last week. Drill equipment is being stored on site, awaiting restart order in the coming months. At this time, the Company wishes to recognize the pro-active support and understanding being provided by drilling contractor, Globexplore Drilling Corp. during this pause in work.
GR Silver Mining President and CEO, Marcio Fonseca, commented, “This transaction is in line with our growth strategy and vision of becoming a leading mining company controlling the most important silver-gold assets in the Rosario mining district, Mexico.”
Orex’s President, Gary Cope said “We are very pleased that we have finalized this new joint venture arrangement, which allows Orex and Pan American to continue the advancement of the Sandra-Escobar project, previously initiated in our joint venture with Canasil Resources Inc.”.
Evrim Resources Corp. announces that it has terminated the option agreement with Harvest Gold Corporation on the Cerro Cascaron project in southwestern Chihuahua, Mexico. Evrim and Harvest Gold Corporation completed two seasons of exploration and ten diamond drill holes at Cerro Cascaron. Drilling results included 20.10 grams per tonne gold and 22.5 g/t silver over one metre in drill hole SPT18-01 at the Serpiente Dorada prospect, and 5.39 g/t gold and 23.7 g/t silver over 0.35 metres in SPED19-02 at the San Pedro prospect. These results and extensive areas of gold-silver showings at lower elevations have not been followed up or tested by drilling.
“At San Jose, upgrading through infill drilling proved more challenging, as mining is transitioning from the central Stockwork zone to the Trinidad North area where mineralization tends to be narrower and more variable in nature. As the mineralization style changes, the operation is implementing various initiatives, such as pillar recovery and narrow vein mining methods, to optimize mineral extraction.”
Mexico Mining Center © 2021 / All Rights Reserved