Category: Exploration and Development

Masivo Announces Drill Program at Cerro Colorado

Masivo Silver Corp. completed an eight-hole, 1,300-meter drill program design at its Cerro Colorado property in Sonora, Mexico. Led by geologists Jorge Rafael Gallardo, Brian Brewer, and Mark Bailey, the program targets high-chargeability anomalies and high-grade polymetallic sulfides, aiming to unlock significant silver, gold, copper, lead, and zinc mineralization across two structural systems.

Roberto Resources Reports Assay Results from Field Exploration Program

Roberto Resources reported results from its first-phase rock-chip and soil sampling on the Janampalla Property in Perú, finding multiple rock samples with significant copper values (many >1 % Cu, some >10 % Cu) and anomalous silver and lead. Soil samples were mostly low, but the rock results suggest strong copper–silver–lead potential, guiding future exploration.

Galore Announces Update On The Dos Santos Project

Galore Resources Inc. updates on its Dos Santos Project in Mexico, with ongoing 5,000-meter drilling at Los Gemelos/Duraznillo. Initial drill core shows promise, with assays pending. The company plans to process 25,000 tonnes of mineralized rock, explores joint ventures, ore-sorting technology, satellite imaging, and drilling expansion, targeting significant copper-gold deposits.

Fuerte Metals hits 8.5 g/t AuEq over 4.0 m, 6.1 g/t AuEq over 1.7 m and 6.1 g/t AuEq over 1.4 m at its Cristina Project, Chihuahua, Mexico

Fuerte Metals reported diamond drill results at its Cristina Project in Chihuahua, Mexico, including highlights like 8.5 g/t AuEq over 4.0 m, 6.1 g/t AuEq over 1.7 m, and 6.1 g/t AuEq over 1.4 m, expanding high-grade zones within the Guadalupe and Los Ingleses vein systems. These findings support continued resource growth across multiple vein structures.

Colibri and Partner – Expands Main Zone by 70 Metres – Returning 7.2 g/t Gold and 80 g/t Silver over 2.6 Meters Within 46.9 Meters of 0.5 g/t Gold at the El Pilar Gold-Silver Project

Colibri President & CEO Ian McGavney commented: “We are pleased with overall results from this recent diamond drilling program. The footprint of the gold & silver mineralization at Pilar has been expanded and opens the doors for potential future drilling along the Main Zone trend as well as the less understood 4T and North Hill trends. Our attention will now be focussed on working with our partner to advance a maiden estimate as well as finalizing plans and permitting for our upcoming up to 50,000 tonne test mine/bulk sample.”

Mithril – Target 2: High-Grade Samples & Second Drill Starts

Mithril Silver and Gold (April 10, 2025) reports high-grade samples at Target 2, Copalquin, Mexico: 1m @ 28.7 g/t Au, 356 g/t Ag; 2m @ 26.8 g/t Au, 1,004 g/t Ag. Second drill rig mobilized for 35,000m program; Target 1 hits depth extensions. Resource update delayed to May.

All News