Category: Exploration and Development

Silver Storm Commences Rehabilitation Activities at La Parrilla

Silver Storm Mining has commenced rehabilitation at its La Parrilla Silver Mine in Mexico. Dynamic Engineering is leading plant rehab, expanding the sulphide circuit 25% to 1,250 tpd (7-9 months). Long-lead items ordered; underground works (drift cleaning, ventilation) underway. SRK reviews restart plan, targeting potential Q2 2026 production.

Heliostar Presents Stronger Economics at the La Colorada Mine in Updated Technical Report

“Today’s results show that the La Colorada mine can continue to be a high-margin, low CAPEX operation with a 6.1-year mine life. This updated study is focused on the open pits at La Colorada, demonstrating positive economics at conservative gold prices and a compelling opportunity at current gold prices. The Company aims to continue to maximize cash generation from stockpiles in the near term and internally fund capital requirements for open-pit production planned in 2027.”

Guanajuato Silver Provides El Cubo Drill Results

Guanajuato Silver reported high-grade drill results from its 2025 exploration at the El Cubo Mines Complex, including bonanza intercepts over 2 kg/t AgEq from the Packman and San Luis veins. The company also discovered two new veins near these zones. El Cubo continues to deliver strong production, with ongoing drilling focused on expanding high-grade areas.

All News