
Heliostar Announces Positive Prefeasibility Study for Cerro del Gallo with Significant Expansion Potential
Heliostar Metals (TSXV: HSTR) released a PFS for its 100% owned Cerro del Gallo project in Mexico: 15.3-year mine life, 85.7k GEOs/yr at AISC US$1,390/oz. Initial capex $195M, post-tax NPV5% $424M and 33% IRR at $2,300/oz Au; $972M NPV and 59% IRR at $3,900/oz Au. Low strip ratio and heap-leach + SART design drive strong economics and upside.

















