Category: Exploration and Development

GR Silver Mining Announces Completion of Initial Resource Estimates at the Plomosas Project in Sinaloa, Mexico

“The publication of the initial resource estimates at the Plomosas Project is the result of a systematic collection of geological information, data review and analysis in a 3D model. This has also allowed for multiple discoveries of high-grade silver and gold mineralization outside of the main mineralized body and has encouraged the Company to continue drilling on multiple targets outside of the resource area.”

Alamos Resumes Drilling on Los Venados

Aloro Mining Corp. is pleased to announce that Alamos Gold Inc. has informed Aloro that after a short break and evaluation it has resumed its reconnaissance drill exploration program on the Los Venados claims, Mulatos District, Sonora Mexico.

Sonoro Announces Metallurgical Column Testing of Cerro Caliche Mineralization Returns Average Recoveries of 74% for Gold

Sonoro’s President and CEO, Kenneth MacLeod, stated, “We are pleased that the average recovery rate obtained from these definitive tests exceeds the projected 72% recovery rate used in the Company’s July 26, 2019, NI 43-101 Technical Report which provided the project’s maiden mineral resource estimate. We’re also pleased that the tests demonstrate similar positive metallurgical recoveries across the entire resource area.”

Phase 5 drilling commences at Radius’s Amalia Project, Mexico

Pan American Silver Corp., the project operator, plans a minimum 3500m diamond core drilling with a second rig to be deployed to test the El Cuervo target in the coming weeks. The current drill program will be fully funded by Pan American pursuant to its option to earn an interest in the Amalia Project.

Xali Gold Submits Exploration Permit Application and Plans Drill Program for El Dorado

Xali Gold Corp. is pleased to advise that exploration permit applications have been submitted for the El Dorado Gold-Silver Project, located in Nayarit State, Mexico. Based on the new 3D model, which identified high-grade mineralization occurring in multiple parallel veins at a spacing close enough to potentially access several veins through common development workings, a drill program with a minimum of 2000 meters is planned for Q4 2021/Q1 2022.

All News