Year: 2021

Telson Reports Campo Morado Q1 2021 Production

Ralph Shearing, Telson CEO and President, stated “These strong first quarter results continue to reflect our steady progression of improving the throughput and recoveries at Campo Morado. To this end, management intends to initiate a rigorous metallurgical testing program to advance through second phase testing the Leachox Process of Maelgwyn Mineral Services and the Albion Process of Core Group, both of which returned positive test results in first phase testing.”

Tocvan Samples 4.5 g/t Au and 735 g/t Ag in Channel Sample at New Triple Vein Zone. Sampling at 4 Trench Extension Returns 19.9 g/t Au in Channel Sample

“The results released today confirm the new vein corridors recently identified by mapping are mineralized and carry similar grade to our Main Zone,” commented VP Exploration, Brodie Sutherland. “Our next phase of drilling will begin later this month. Not only do we have follow-up work to continue at our Main Zone with the recent surface exploration results we have no shortage of targets to test, especially along the 4 Trench Extension and the new Triple Vein Zone.”

Canuc Resources Announces Options Grant

Canuc Resources Corporation is pleased to announce that the Company has granted, under its rolling stock option plan, 6,000,000 incentive stock options to officers, directors, employees, and consultants of the Company.

Alien Metals Ltd. – High-Grade Silver up to 734g/t and 1.9% Zinc Encountered at New Extension to San Celso Silver Project, Mexico

“We are very pleased with the results of this sampling and mapping program, which are greatly encouraging for the potential of the project. We were particularly pleased to see that the results confirm our interpretation that there is a continuation of silver and base metals mineralisation and historic mining within the Nueva Andromeda permit area, with the total strike length now increased by a further 20-30% for the San Celso Project.”

Silver Tiger Intersects 5.6 meters Grading 1,010.3 g/t AgEq Within 14.2 meters of 519.5 g/t AgEq in the Benjamin Vein

Silver Tiger’s CEO, Glenn Jessome, stated, “The first drill holes following up on the discovery of the Benjamin Vein in January have delivered wide zones of high grade silver mineralization. The discovery on the Benjamin Vein is located 1.25 kilometers north of the discovery announced in February of the high grade Footwall Zone in the Sooy Vein, with both discoveries in the Flat formation kilometers apart. The Benjamin Vein appears to be the northern extension of the Sooy Vein.”

Prime Reports Results Including 8.95 gpt Au and 74.5 gpt Ag over 4.5 Metres and 1.96 gpt Au and 63.6 gpt Ag over 18.7 Metres from Ongoing Drilling at Los Reyes

“At this early stage, we have extended the margins of known deposits, and the gold and silver grades encountered appear consistent with current resource grades. Drilling also gathered silver assay data in an area of the Project where limited silver assaying had occurred historically and was potentially underrepresented in our current resource.”

All News