Guerrero Drills 26.98 Metres Grading 1.07 g/t Gold on Biricu Project, Guerrero Gold Belt, Mexico
Guerrero Ventures Inc. is pleased to provide results of the recently completed maiden diamond drill program at its Biricu Project in the Guerrero Gold Belt, Guerrero State, Mexico. Highlights of the drilling program include a drill intersection of 26.98 metres (m) grading 1.07 g/t gold and 0.29 g/t silver at the Punto Rojo target. The interval includes a zone of 6.85m grading 2.78 g/t gold and 0.92 g/t silver. Drilling at Punto Rojo has to date outlined an area with a minimum strike length of 700m and minimum depth extent of 600m of strongly hornfelsed and selectively skarn altered Mezcala sediments, intrusive units as well as a breccia unit. All units exhibit strong similarities in composition and alteration to productive units encountered in other exploration and mining operations in the prolific Guerrero Gold Belt.









