Tag: Exploration and Development

Cyprium Mining appoints mining contractor for Potosi Silver mine development

Mr. Alain Lambert, Chairman and CEO of Cyprium commented: “We appointed Bergmann in February to carry-out the Potosi shaft #3 project which consisted in the rehabilitation and improvement of the extraction capability of the shaft as well as improvement of infrastructure, security and preparation of prospective mining areas at levels 2 to 4 of the mine. Not only did Bergmann complete the project on time and on budget but they also contributed several ideas which strengthened the original plan.” He added: “Bergmann has a deep and extensive knowledge of the Potosi mine as they were the contractor used by our joint venture partner when the mine was last in production a few years ago.”

Almadex Confirms Porphyry System at Encinal Target, El Cobre Project, Mexico: Hits 1.5 Meters of 109.5 g/t Gold and 0.15% Copper and 13.0 Meters of 0.57 g/t Gold and 0.21% Copper

Almadex Chairman, J. Duane Poliquin commented, “We have an outstanding portfolio of mineral projects and we are pleased to have commenced drilling on the most advanced, El Cobre. We are exploring a very large zone of alteration hosting several porphyry systems and expect that this round of drilling will better define the systems for future drilling. These first results are from only one of the targets identified and clearly demonstrate the potential of the Encinal target while providing important data for the drilling we are planning based on these results.”

Millrock and Centerra Gold Commence Exploration at Los Chinos and Los Cuarentas Gold Projects, Sonora, Mexico

Millrock Resources Inc. announces that surface exploration is underway at the Los Chinos and Los Cuarentas gold projects in Sonora State, Mexico. The projects are the subject of a previously-announced option to joint venture agreement with Centerra Gold Inc. Under the option agreement, Centerra can earn a 70% interest by completing US$5.0 million in exploration expenditures over a five-year period at Los Chinos, and US$2.0 million at Los Cuarentas.

Gold Resource Corporation Continues Returning High-Grade Drill Intercepts at Switchback Including 9.50 Meters of 8.85 g/t Gold, 669 g/t Silver, 3.15 Meters of 15.79 g/t Gold, 110 g/t Silver and 13.23 Meters of 4.03 g/t Gold, 114 g/t Silver

Mr. Barry Devlin, Vice President of Exploration, stated, “This latest round of drill results from Switchback continues to define, as well as expand, this impressive polymetallic vein system comprised of multiple en echelon veins. In particular, step-out Hole 516115 expands high-grade mineralization to the southeast where we had thought precious metal grades may have started to decrease. It is also exciting to see some of the highest gold grades drilled to date at Switchback in these latest intercepts. Our primary exploration goal is to continue expanding the Switchback epithermal vein system in the Arista Mine.”

Golden Goliath Resources – Field Work Underway in Uruachic

The Company is pleased to announce that exploration field work is currently being conducted by Fresnillo plc on some of the Company’s Uruachic properties pursuant to the Option Agreement signed between Minera Delta, S.A. de C.V. (the Company’s wholly owned Mexican subsidiary) and Desarrollos Mineros El Aguila, S.A. de C.V. (a Fresnillo plc’s subsidiary) dated November 5th, 2015. Sampling and other work is being conducted by Fresnillo personnel and a report on the work will be given to Golden Goliath at the year end.

Álamos Gold recibió el Outstanding Business Award otorgado por la Cámara de Comercio Canadiense en México.

En el marco del evento CANCHAM DAY2016 – Business Beyond Borders, mismo que se llevó a cabo el pasado jueves 26 de mayo, en el Hotel Camino Real Polanco, de la Ciudad de México, El Dr. Luis Chávez Martínez, Senior Vicepresidente México de Álamos Gold Inc. recibió el premio Outstanding Business Award (COBA) otorgado por la Cámara de Comercio Canadiense en México CanCham, por las acciones de Responsabilidad Social Empresarial llevadas a cabo por Minera Santa Rita, empresa filial de Álamos Gold Inc. especialmente en su participación con el proyecto, Taller de Costura que se creó para dar empleo a mujeres del Ejido 16 de Septiembre en el Municipio de Altar, Sonora.

Mexus Gold US: Santa Elena Mine Update

Mexus Gold US announced that work on the Santa Elena mine is progressing as planned. On My 24th, representatives from MarMar holdings and Mexus held a meeting and adopted a mining plan with numerous items being discussed and agreed upon. Out of this meeting came the decision to obtain a blasting permit in the name of the JV as opposed to using a blasting contractor. The parties can control costs and manage the process more efficiently than using an outside vendor. It will take 4 to 6 weeks to obtain this blasting permit allowing time for our partner to bring in additional equipment. In the end, this property will be brought into full production faster and much larger than first anticipated.

Cyprium Mining finalizes rehabilitation of shaft #3 of the Potosi Silver Mine

Mr. Alain Lambert, Chairman and CEO of Cyprium commented: “Over the last three months we have replaced almost 1.5 kilometers of railway tracks at level 0 and at level 4. This includes the installation of railway tracks between an existing raise from the level 4 proposed initial mining area to shaft #3 as well as the installation of railway tracks in the level 4 mining area where much of our near-term mining activities will take place. New air and water tubing has been installed and we have rehabilitated existing equipment including two air-loaders and a small electric locomotive. Once we have re-assembled the air compressor which was brought down into the mine last week, we will turn our focus on cleaning up old stopes in level 2, 3 and 4, retrieving existing mineralized material from past mining operations and initiating drilling and blasting.”

All News