Minera Alamos Strengthens Mine Operations Team in Advance of Construction Decision at Santana Gold Project

Minera Alamos Inc. is pleased to announce the appointment of Carolina Salas as Vice President – Technical Services. Ms. Salas, who has worked with the Company’s senior management group at previous Mexican gold operations, will oversee final preparations related to the construction of commercial scale gold production facilities at the Santana Project in Sonora. Her addition will add further project development and operations expertise to an already strong in-country team with a proven track record successfully developing low capex gold projects.

Ethos Trenches 0.47g/t Au Over 127m Including 1.11g/t Au Over 40m at its La Purisima Gold Project, Chihuahua, Mexico

Commented Craig Roberts, P.Eng., President and CEO of Ethos: ‘We are very encouraged by the trench results that show dissemination of gold mineralization over significant intervals outside of the primary veins in the Purisima Vein Zone, and also by the new high-grade intervals identified in the Stockwork Zone. We will use these results to plan our fully permitted maiden drill program of approximately 15 RC holes which we intend to commence shortly.’

High Grade Silver and Additional Gold Results in Surface Channel Sampling Suggests Potential for SE Extension to the San Marcial Resource

Goldplay President and CEO Marcio Fonseca commented, ‘We are extremely pleased by the channel sample results from trench SMtr-022 as they indicate the potential for expanding the resource into the Guacamayo target to the SE of the San Marcial NI 43-101 silver resource area. Wide mineralization on surface, including high grade silver up to 1m at 974 g/t Ag, provides further encouragement for potentially expand the resource. ‘

Impact Silver Commences Dense Media Separation Engineering Study at Capire

IMPACT Silver Corp. is pleased to announce commissioning of an engineering study to test the viability of Dense Media Separation (DMS) processing at its 100% owned Capire Production Centre located in the Mamatla district, Mexico. The Capire Production Centre is currently on standby and positive results from these DMS tests and other optimization studies may lead to a new operating plan toward placing Capire into production.

All News