
Bendito Resources extends the strike length of Alacran Epithermal mineralization with phase 1 drilling, and reports intercepts for the first 9 holes including 1.49g/t AuEq over 51 meters, starting at 1.5m depth from the Puerto de Oro Target
Mr. John Antwi, President and CEO of Bendito, commented: “Phase 1 drilling at Alacrán has achieved our expectations of significantly extending the epithermal system to the southeast of the known historical resource estimates. The exciting holes, including BSS-23-005 that shows 1.49g/t AuEq over 51m starting at 1.5m from surface, demonstrate the potential for open pit mining. These results underpin our focus on generating shareholder value at Alacran.”













