GoGold Reports Parral Production for Quarter Ending June 2023 and Reports on Planned Zinc Circuit

“During the quarter at Parral, we continued with our planned reprocessing of old pad material which resulted in further metal extraction plus reclamation of new pad space which has the benefit of delaying further pad capital expenditure. In addition, we have been working on further optimization of the SART process to generate an additional saleable metal (zinc) and more importantly, the regeneration and recycling of more cyanide which has the benefit of reducing the volume of fresh cyanide required for purchase.”

Canuc Acquires Additional Claim at San Javier

“The recently purchased claim is a strategic addition to the company’s claim group at San Javier and provides Canuc with comprehensive coverage of an area surrounding the largest magnetic-high anomaly detected during the company’s magnetic survey of 2021.”

Orla Mining Provides Second Quarter 2023 Operational Results

During the second quarter of 2023, the Camino Rojo Oxide Mine produced and sold 29,058 and 29,773 ounces of gold, respectively. Camino Rojo continues to perform according to plan, and the Company remains on track to meet 2023 annual gold production guidance of 100,000 to 110,000 ounces.

Torex Gold Reports Positive Drilling Results from ELG Underground

“Infill and step-out drilling to the south at El Limón Sur Deep was successful in extending higher-grade mineralization outside of the current resource block model. Several drill holes returned notable intersects over favourable widths including 88.92 grams per tonne gold equivalent over 14.5 metres in drill hole LS-220, 11.20 gpt AuEq over 29.4 m and 19.03 gpt AuEq over 13.3 m in LS-221, 6.86 gpt AuEq over 16.6 m in LS-187, and 7.46 gpt AuEq over 11.6 m in LS-184.”

All News