Xtierra Completes Successful Drilling Program on Bilbao Project

Xtierra Inc. is pleased to announce the successful completion of an additional drilling campaign in the southern part of its silver-zinc-lead-copper project in the state of Zacatecas, Mexico. All six drill-holes, with a total of 1784.10 metres, encountered thick intersections of good grade mineralization with notable high grade silver intersections throughout. Four of the drill-holes showed highly mineralized intervals comprising massive to semi-massive sulfide mineralization varying between 20 and 40m in thickness. A summary of the principal intersections for each of the drill-holes is listed below.

Goldcorp reports 2013 second quarter results

Goldcorp Inc. today reported quarterly revenues of $889 million, generating adjusted net earnings1,2 of $117 million, or $0.14 per share, compared to $332 million, or $0.41 per share, in the second quarter of 2012. A non-cash impairment charge, primarily related to exploration potential at Peñasquito, led to a net loss in the quarter of $1.93 billion compared to net earnings of $268 million in the second quarter of 2012. Adjusted operating cash flow1,3 was $388 million or $0.48 per share.

SilverCrest Announces Santa Elena Expansion Pre-Feasibility Study;

SilverCrest Mines Inc. is pleased to announce that it has filed its NI 43-101 Technical Report entitled “Santa Elena Expansion Pre-Feasibility Study and Open Pit Reserve Update” for its operating mine located in Sonora, Mexico. Summaries of the revised Life of Mine Plan, operating costs, capital costs and Expansion project economics are presented in tables below. All dollar amounts are expressed in U.S. dollars unless otherwise specified. The effective date of this Technical Report is April 30, 2013.

Alamos Reports Strong Second Quarter 2013 Results

Alamos Gold Inc. today reported its financial results for the quarter ended June 30, 2013 and reviewed its operating, exploration and development activities. All amounts are expressed in United States dollars unless otherwise specified.

Nyrstar announces 2013 Half Year Results

Challenging trading environment with downward movements in base and precious metal prices during H1 2013; strategic price hedges put in place for H2 2013

Average zinc price in H1 2013 slightly up on H2 2012 (USD 1,937/t compared to USD 1,916/t) due to strong start to year; however, since March the price has traded between USD 1,800 – 1,900/t
Average silver and gold prices declined by 15% and 10% respectively compared to H2 2012, impacting mining C1 cash costs and to a lesser extent Metals Processing by-product gross profit
Entered into strategic price hedges for zinc, and subsequently gold and silver, for H2 2013

All News