Goldcorp Declares Seventh Monthly Dividend Payment for 2013

Goldcorp Inc. is pleased to declare its seventh monthly dividend payment for 2013 of $0.05 per share. Shareholders of record at the close of business on Thursday, July 18, 2013 will be entitled to receive payment of this dividend on Friday, July 26, 2013.

Coeur’s La Preciosa Project PEA Indicates 17-Year Initial Mine Life; Average Annual Silver Production of 9.1 Million Ounces over the First 14 Years

Coeur Mining, Inc. announced results from a Preliminary Economic Assessment for its wholly-owned La Preciosa silver-gold project located in Durango state, Mexico. The PEA indicates an initial estimated mine life of 17 years recovering an estimated 134.5 million ounces of silver and generating a 17% after-tax internal rate of return using price assumptions of $25 per silver ounce and $1,500 per gold ounce.

Concluyen huelga en minas de Slim

42 Mil 211 onzas de oro y 4 mil 234 onzas de plata fue la producción en el primer trimestre de 2013 del yacimiento de ‘El Coronel’ de la Minera Frisco, propiedad de Carlos Slim

Sierra Metals Announces Graduation to the TSX

Sierra Metals Inc. is pleased to announce that its common shares have been approved for listing on the Toronto Stock Exchange and will commence trading on the TSX at the opening of market on July 8, 2013. Concurrent with the TSX listing, the Common Shares will be de-listed from the TSX Venture Exchange. The trading symbol of the Common Shares will continue to be “SMT”.

Candente Gold acquires the rights to mine tailings

Candente Gold Corp. said that its Mexican subsidiary, Minera CCM El Oro Jales S.A. de CV, has signed an agreement for the access and processing rights to historic gold and silver tailings deposits in the El Oro District of Mexico State, central Mexico.

El Tigre Silver Announces Reserves and Resources at El Tigre Property in Sonora Mexico

El Tigre Silver Corp. is pleased to announce the completion of the National Instrument 43-101 Preliminary Feasibility Study for the El Tigre Silver & Gold Project, Municipio De Nacozari De Garcia, Sonora, Mexico on the El Tigre silver and gold project in Sonora, Mexico prepared by Hard Rock Consulting. The PFS supersedes the “National Instrument 43-101 Technical Report, El Tigre Silver Property, Municipio De Nacozari De Garcia, Sonora, Mexico” prepared by Thomas R. Gibson, P. Geo and filed on SEDAR on October 28, 2011.

Osisko intercepts 68 metres averaging 1.26 g/t Au, 31.5 g/t Ag, 0.5% Cu at Cuervo

* Osisko has identified 6 main anomalies which are at or near drill stage, including the Milagro Anomaly, which has a 4 km x 1 km soil and lithogeochemical signature
* 114 targets remain to be reviewed
* 11,870 km2 of Au prospective geology has been covered with approximately 7,700 stream sediment samples as well as 2,800 rock and 3,800 soil samples
Geophysics completed over 320 km2
* Osisko presently controls 9,600 km2 of mineral rights in Mexico

All News