
Tocvan Core Drilling Returns 10.3 g/t Gold Over 9.7 meters within 83.5 meters of 1.3 g/t Gold Includes 60.6 g/t Gold Over 1.6 meters, Highest-Grade Interval Since Prospect Discovery
Tocvan Ventures core drilling at Gran Pilar Gold-Silver Project returned 10.3 g/t Au over 9.7m (incl. 60.6 g/t Au over 1.6m) within 83.5m of 1.3 g/t Au in hole JES-25-104; highest-grade since discovery. Another hole hit copper-silver. Advancing pilot mine permitting. (March 11, 2025)










