Silver Bull Resources Announces 5.35 Billion Pounds Zinc, 87.4 Million Ounces Silver In Updated Sierra Mojada Measured And Indicated Resource:
This resource update models the mineralization defined at Sierra Mojada to zinc and silver prices realistic of the current market conditions, stated Tim Barry, President, CEO and director of Silver Bull. Sierra Mojada is one of only a handful of projects with any appreciable zinc resources and is one of the largest undeveloped silver-zinc projects in Mexico. It has excellent infrastructure; it is located 3 hours from an international airport with a paved road right to site; it has a functioning railway right to site; runs on grid power; and it has a skilled mining work force to draw upon in the immediate local area. This resource provides excellent leverage to both zinc and silver prices and has the potential to be scaled in size depending on metal prices.











