Category: Investor’s Corner

GoGold Reports Record Quarterly Production

“The improvements made at Parral in late 2016 have now taken effect and we expect to see continued increases in production in the near future” said Brad Langille, CEO.

Alix Resources Acquires Southern Nevada Lithium Property

President Mike England states, “This property represents a significant opportunity for the Company based on our knowledge and experience dealing with lithium in hectorites and our association with Lithium Australia. It is early days on this project; field crews are on site and more information will be forthcoming in the near future.”

Starcore repays $4.5 million bonds

“We are pleased to have met our obligations to the Bond holders,” said Robert Eadie, President & CEO of the Company. “Our investors and financiers have been exceptional partners for Starcore and have supported our aspirations for growth. We will continue to develop these alliances as we forge ahead with our plans for increasing shareholder value.”

Excellon Reflects On The Passing Of Director Thor Eaton

“Thor was a gentleman above all things,” commented André Fortier, Chairman of the Board of Directors. “He had a love for life and a sense of optimism that will be greatly missed by all of us at Excellon. Our deepest condolences to his family and all of the people he touched over the years.”

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico

Gordon Babcock, Chief Operating Officer of Sierra Metals Inc. commented: “We are satisfied with the updated Resource and Reserve report for the Bolivar mine and the quality of the defined areas within the Report. At Bolivar, a 20,000-meter drill program has been in execution since the latter part of 2016 with a significant portion already completed. Drilling is taking place at the Bolivar West, Bolivar Northwest and will continue at the La Sidra area. Also, a recently completed geophysical program utilizing Titan 24 techniques has targeted near-surface, coincident strong chargeability (IP) and resistivity anomalies in the Southwestern sector of the property near Bolivar West. These targets are being drilled with a diamond drilling program and subsequent exploration programs are targeted to increase tonnage and grade at Bolivar.”

Great Panther Silver Reports First Quarter 2017 Production Results

“The planned suspension of milling operations at Topia was in effect throughout the entire first quarter and had an obvious impact on our overall metal production,” stated Robert Archer, President & CEO. “However, we continued mining at Topia throughout this period, and with the commissioning of the upgraded plant and the new tailings handling facility now underway, we have commenced the processing of ore stockpiled during the shutdown. This will continue through the balance of the year, such that we anticipate meeting our annual guidance.”

Endeavour Silver Produces 1,076,974 oz Silver and 11,724 oz Gold (1.9 Million oz Silver Equivalents) in the First Quarter, 2017

Endeavour CEO Bradford Cooke commented, “From a production standpoint, we are still recovering from the reduced mine development and operational challenges we faced in 2016. Our plan is to increase production throughout the year as we improve ore grade controls at El Cubo, slowly return Guanaceví to good health, optimize throughput at Bolañitos and regain access to reserves at each mine in order to achieve our production guidance.

All News