Category: Investor’s Corner

Silver Viper Closes $3.6 Million Private Placement

Silver Viper Minerals Corp. closed a $3.6M private placement, issuing 11,993,149 units at $0.30 each, raising $3,484,161. Each unit includes one share and half a warrant, exercisable at $0.50 for 24 months. Proceeds will fund drilling at La Virginia and general corporate purposes. Eric Sprott increased his stake to 7.3% non-diluted, 10.6% fully diluted. Insiders subscribed for 616,667 units.

Orogen Royalties Re-Lists on the TSX Venture Exchange

Orogen Royalties Inc. re-lists on TSX Venture Exchange (OGN) after a plan of arrangement with Triple Flag Precious Metals Corp., which included a $10M private placement. Orogen focuses on organic royalty generation, leveraging its Ermitaño 2% NSR gold-silver royalty in Mexico and other assets. Profitable since 2021, debt-free, with $17M cash, Orogen anticipates $40M in partner-funded exploration in 2025.

Mithril Silver & Gold Arranges up to C$11.5M Placement to Accelerate Exploration at Copalquin, Mexico

Mithril Silver and Gold Limited (TSXV:MSG, ASX:MTH) announced a C$11.5M private placement, issuing up to 31,944,700 shares at C$0.36 each to fund exploration at its Copalquin project in Mexico. The placement, led by Ventum Financial Corp., has strong demand from institutional investors. Proceeds will accelerate drilling and exploration, with closing expected on July 24, 2025, pending regulatory approval.

Starcore Enters into LOI to Lease a Historical Past-Producing Silver Mine

Starcore International Mines Ltd. signed a non-binding Letter of Intent to lease the San Juan Nepomuceno (Tortilla Project) in Queretaro, Mexico, for 10 years. The project includes a historical mine with no production records but significant potential. Starcore will pay MX$5,000,000 (~US$268,500) over six months, with a 2% NSR to the owner post-payments. The owner may sell the claims for US$7,000,000 during the lease.

GoGold Reports Q3 Production at Parral of 555,500 Silver Equivalent Ounces

GoGold Resources Inc. reported Q2 2025 production of 555,500 silver equivalent ounces from its Parral mine, including 201,616 silver ounces, 3,100 gold ounces, 128 tonnes of copper, and 140 tonnes of zinc. The company’s strong cash flow from Parral supports exploration and engineering at Los Ricos, positioning GoGold well for the anticipated construction start at Los Ricos South.

First Majestic Produces 7.9 Million AgEq Ounces in Q2 2025 Consisting of 3.7 Million Silver Ounces and 33,865 Gold Ounces; Announces Improved 2025 Production and Cost Guidance and Conference Call Details

First Majestic Silver Corp. reported a Q2 2025 production of 7.9 million silver equivalent ounces from its four Mexican mines, up 48% from Q2 2024. Silver production rose 76% to 3.7 million ounces. The company revised its 2025 guidance upward, expecting 30.6-32.6 million AgEq ounces, driven by strong performances at Los Gatos, Santa Elena, and San Dimas.

Mithril Silver & Gold Announces $10 Million Brokered Private Placement of Common Shares

Mithril Silver and Gold Limited announced a private placement of 27,778,000 shares at C$0.36 each, raising C$10,000,080. The proceeds will fund exploration at the Copalquin project in Mexico and general corporate purposes. The offering, led by Ventum Financial Corp., includes an option for an additional 15% of shares and is set to close on July 29, 2025, pending regulatory approvals.

Endeavour Silver Produces 1,483,736 Oz Silver and 7,755 Oz Gold (2.5 Million Silver Equivalent Oz) in Q2 2025

Endeavour Silver Corp. reported Q2 2025 production of 1.48 million silver ounces, 7,755 gold ounces, and 2.5 million silver equivalent ounces, up 17% from Q2 2024, driven by the Kolpa acquisition. Guanaceví and Bolañitos outputs were slightly below plan, while Kolpa performed as expected. Terronera’s ramp-up reached 1,400 tpd in June, targeting design capacity in Q3. The company sold 1.47 million silver and 7,706 gold ounces.

All News