Category: Exploration and Development

Alamos Announces Discovery of New Zones of Mineralization at Cerro Pelón and La Yaqui

“We are very pleased with the early results from our exploration programs at Cerro Pelon and La Yaqui with step-out drilling indicating the potential to expand the mineral reserve and resource base at both deposits. These satellite deposits are expected to provide our lowest cost production at Mulatos and are a significant source of near term production growth. These remain our highest priority exploration targets at Mulatos. Following up on the strong results to date, we are adding additional rigs to target these new zones of mineralization through the end of this year,” said John A. McCluskey, President and Chief Executive Officer.

Torex Signs an Agreement with the State Government for Permanent Police Presence

Torex Gold Resources Inc. is pleased to announce that its 100% owned subsidiary Minera Media Luna, S.A. de C.V. has signed a letter of intent with the Ministry of Public Safety of the State Government of Guerrero, endorsed by the Federal Government, for the provision of permanent police presence in the areas adjacent to the Company’s Morelos Gold Property in southwest Mexico.

Baja Mining: Access to Boleo Plant Restricted

Baja Mining Corp. has been advised by Minera y Metalúrgica del Boleo, S.A. P.I. de C.V. that access to and from the Boleo site located near Santa Roselia, Baja California Sur, Mexico is being restricted by the local authorities. Senior management of MMB has informed Baja that the Municipality of Mulegé has claimed it is entitled to certain construction permit-related payments from MMB. The restrictions result directly from these claims. Baja and MMB believe that resolution of the legal appeal launched to resolve this matter still remains before the courts and consequently the Municipio has acted without legal authority in imposing restrictions.

Minera Alamos Inc. Initiates Drilling on Historic North Deposit

Minera Alamos Inc. reported today that it has commenced drilling on the North Deposit of its 100% owned Los Verdes project in Sonora Mexico. The Company purchased the North Deposit (formerly Potreritos) in late 2011 from the General Mines Direction of Mexico in order to extend the mine life of the Los Verdes project.

Odyssey Marine Exploration Provides Update for “Don Diego” Phosphate Project and Renegotiates Bank Loan Agreement

Coring and testing completed to date, and calculated on a NI 43-101 compliant basis, verified by expert third parties, have determined that the resource estimate includes 588 million tonnes of phosphate ore with an average in situ P2O5 of 18.1%, comprised of 114.9 million ore tonnes of measured phosphorite, 243.6 million tonnes of indicated phosphorite and 229.9 million tonnes of inferred phosphorite. This is an increase of 19% from the last reported resource estimate of 494 million (measured, indicated, inferred) tonnes of phosphate ore.

Azure Minerals – Significant High Grade Silver Discovery

HIGHLIGHTS:

• Significant intercepts, including: 9m @ 1,235g/t Ag (from 3.0m depth) within 39m @ 347g/t Ag from surface

• Mineralisation is contained in a thick horizontal layer, capping flat-topped hills, over at least 500m of strike length and up to 300m in width

• Mineralisation starts at surface and continues consistently and uninterrupted for thicknesses of up to 70m

Orex Options the Sandra Escobar Silver-Gold Project in Durango, Mexico

Orex Minerals Inc. is pleased to announce that it has entered into an option agreement dated September 15, 2015 with Canasil Resources Inc. in respect of Canasil’s Sandra Escobar Silver-Gold Project in Durango, Mexico. Pursuant to the terms of the Option Agreement, Orex has a right to earn up to a 65% ownership interest in the Project.

Almaden Provides Ixtaca Metallurgical Program Update: Confirms High Limestone Gravity/Flotation/Leach Recoveries for Gold and Silver

Almaden Minerals Ltd. is pleased to report on the Company’s 100% owned Ixtaca gold-silver deposit located in Puebla State, Mexico and the progress of its on-going PreFeasibility level metallurgical test work program. The focus of the ongoing metallurgical test work program has been on the limestone material. Reported today are preliminary, non-optimised results from the leaching flotation concentrates.

All News