Category: Exploration and Development

Timmins Gold Reports Production of 25,863 Gold Ounces for the Second Quarter of 2016

“We are very pleased with our operating performance during the quarter and year to date,” stated Arturo Bonillas, President of the Company. “Gold ounces produced this quarter increased by 13% over the same period last year. Production for the quarter exceeded expectation due to the pit yielding more tonnes at a higher grade with a lower strip ratio than plan. We have successfully implemented multiple cost reductions this year (including mine-site G&A, mining and cyanide cost reduction), and we will continue to look to drive costs lower and increase operational efficiencies.”

Alset Executes Final Agreement on Lithium Salars in Mexico

Alset Energy Corp. is pleased to announce that the Company has signed the final agreement to acquire the right to earn a 100% interest in the previously announced Mexican lithium, potassium and boron brine salar assets located in Zacatecas and San Luis Potosi, Mexico. After a review of all data and completion of a site visit by Alset and its advisors, the Company has decided to acquire four large concessions containing seven top priority salars which include, Caliguey, La Doncella, Colorada, La Salada, Santa Clara, Saldivar and Chapala. Although there are several other salars noted on these four concessions, very little work has been completed on them to date. The Company selected these salars due to their attractive lithium, potassium and boron values from limited shallow sampling down to a depth of five metres. Of particular interest is the La Salada salar where preliminary and unaudited analyses of samples from the southern half of the salar returned grades frequently exceeding 1500 mg/l with occasional values over 2000 mg/l lithium, 8% potassium and 60 mg/l boron. The depth and grade beneath 5 metres is unknown at this time but preliminary geophysical surveys indicate a possible depth of 70 metres.

Golden Goliath Resources – San Timoteo Report Positive

The Company is pleased to announce the completion of its recent exploration program on its 100% owned San Timoteo property in Chihuahua, Mexico. The 2016 program involved using the Company’s Terraspec machine to analyze clay minerals from existing, property wide, drill core and other samples including samples from the area of the 500 level San Martin adit. The aim of this work was to allow the company to build a 3D model of clay mineralogy to aid in the planning of future drill holes. Because different clay minerals form at different temperatures they can be used to differentiate different levels in the epithermal system that deposited the mineralization. Different metals are deposited at various paleo depths as the mineralized solutions rise and cool. Base metals are deposited first in the deepest levels and are sometimes related to porphyry style mineralization. Porphyritic rocks have been encountered at San Timoteo and that potential may exist on the property at greater depth.

Great Panther Silver Reports Fatal Accident At Its Topia Mine

“We are deeply saddened by this tragic event,” stated Robert Archer, President and CEO. “On behalf of all of us at Great Panther, I wish to extend our most sincere condolences to the deceased’s family and friends, and to all of our co-workers at our Topia Mine. Regrettably, this accident comes even as we are continuing a complete safety review across all of our operations. All such incidents are unacceptable and we will continue to do everything possible to prevent a recurrence.”

Gold Resource Corporation Reports Preliminary Second Quarter Production of 10,011 Gold Ounces and 572,500 Silver Ounces Maintaining 2016 Annual Outlook

Gold Resource Corporation reports preliminary production results for the second quarter ended June 30, 2016 of approximately 10,011 ounces of gold, 572,500 ounces of silver and significant base metals. Gold Resource Corporation is a gold and silver producer with operations in Oaxaca, Mexico and exploration in Nevada, USA. The Company has returned $108 million to shareholders in monthly dividends since commercial production commenced July 1, 2010, and offers shareholders the option to convert their cash dividends into physical gold and silver and take delivery.

Capstone Mining 2016 Second Quarter Production Results

Capstone Mining Corp. today announced production results for the three and six months ended June 30, 2016. Combined production totalled 28,100 and 52,700 tonnes of copper in the second quarter and year-to-date periods, respectively, with additional by-products of zinc, molybdenum, lead, silver and gold.

Evrim’s JV Partner First Majestic plans drilling the Ermitaño Gold-Silver Project

Stewart Harris, Evrim’s Vice President of Technical Services commented, “The drilling program at the Ermitaño West target represents an excellent opportunity to add to the mineral endowment of a 10 kilometre by 15 kilometre trend, which includes Ermitaño East, Veta Valentina, Durazno area, and the Santa Elena Mine. Vein structures at Ermitaño West exhibit similar structural characteristics to the east-striking principal veins at Santa Elena and vein textures suggest a shallow level of exposure in this low to intermediate sulphidation epithermal system. The shallow level of exposure suggests that the most prospective part of the epithermal gold-silver system has been preserved beneath this untested target.”

Piden a mineros cuidar su fuente de empleo

En el marco de la celebración del Día del Minero, el secretario general del Sindicato Minero Metalúrgico don Napoleón Gómez Sada, Carlos Pavón Campos, pidió a los trabajadores que cuiden sus empleos.

Alset Provides Update on Mexican Lithium Salars and Ontario Projects

Alset Energy Corp. is pleased to announce that the Company continues to move towards completion of the definitive agreement to acquire a right to earn 100% in the previously announced Mexican lithium, potassium and boron brine salar assets located in Zacatecas and San Luis Potosi, Mexico. Alset’s Mexican subsidiary, Grupo Minero Alset, has been incorporated and registered with the requisite government authorities. In addition, the Optionors, through Alset’s legal counsel in Mexico, are filing all documentation with the governing bodies with respect to the mineral concessions. Permitting for exploration and development work will start immediately after the completion of the definitive agreement.

All News