Category: Exploration and Development

Southern Silver Substantially Increases Zinc Recoveries and Grades in New Metallurgical Test Results; Generates Separate Copper Concentrate

Southern Silver Exploration Corp. reported today that additional metallurgical test work on the Skarn Front deposit from the Cerro Las Minitas Project has resulted in both the successful separation of a potential “saleable grade” copper concentrate as well as the generation of a cleaner zinc concentrate grading above 50% zinc without sacrificing zinc, lead or silver recoveries.?

Endeavour Silver Reports Multiple High-Grade Infill Drill Intercepts and Files Prefeasibility Study Technical Report for the Terronera Mine Project, Jalisco, Mexico

Luis Castro, Vice President, Exploration for Endeavour Silver, commented, “These infill drill results helped us meet our goal this year to increase our measured and indicated resources. The high silver and gold grades, excellent continuity of mineralization and significant exploration upside to expand the resources reinforce our view that Terronera has the potential to become the next key asset for the Company.”

Coeur Reports Fatal Accident at Palmarejo

Two underground production drillers fell into a void after the ground below them collapsed. The area was immediately evacuated and all underground operations were suspended pending emergency response and initial investigation. The Company is working closely and cooperatively with the authorities to respond to the situation. The ground collapse occurred in a highly localized area and does not affect other portions of the mine. Operations have resumed except in the specific level of the underground mine where the incident occurred.

Prize Mining Commences Diamond Drill Programs at the Manto Negro Copper Project and Toughnut Gold-Silver Properties

At Manto Negro, diamond drilling is focused on the deposit areas known as El Granizo and Pilar Grande. While these showings lie on the same stratigraphic horizon, they are 18 kilometres apart and are only two of thirty-five known high-grade copper showings that exist on the extensive property. The drill program will consist of approximately 3,000 metres in 30 holes, divided equally between the two areas. This first drill program is designed to provide a good understanding of the style, grade and continuity of the copper mineralization and lay the foundation for follow-up drilling to define a resource.

Capstone Mining Announces High Grade Step-out Holes at Cozamin Mine

“Given the grade and substantially thicker intervals in multiple new drill intercepts, including holes well up-dip of the March 31 resource model, we have decided to re-estimate the MNFWZ Mineral Resource,” said Brad Mercer, Senior Vice President of Exploration at Capstone. “We have completed drilling up-dip and along strike, and to a lesser extent down-dip, from the March 2018 Mineral Resource estimate. We intend to keep drilling with five to six drills for the remainder of 2018, both stepping out and infilling the MNFWZ extension.”

The Pinos Project Preliminary Economic Assessment results indicate a 7 year Life of Mine with projected gold equivalent ounce production of 89,000 with an after-tax IRR of 25%.

Curtis Turner, President and CEO of Candelaria Mining stated: “I am pleased to announce the results of the Pinos PEA. The PEA shows that Pinos is a great small scale project with the ability to grow. We are encouraged, not only by the PEA, but with the exploration potential on the property. The project is fully permitted. We have already sourced much of the processing facility. Therefore, we have limited much of the risk associated with the start-up of most projects at a PEA stage. Developing the property as outlined in the PEA will allow us to commence with a low-capex project which will generate cash flows and to allow us to expand the operations, conduct further exploration work and continue to advance the other projects in our portfolio.”

All News