Category: Exploration and Development

Drilling at Cerro Cascaron to Commence next Week

Harvest Gold’s President and CEO Rick Mark states, “I am very pleased to let our shareholders know that drilling is planned to begin next week. It has been a long wait, but everything is finally in order and we are ready to go. And, with the new money in the treasury, we can move more aggressively on the Property this fall. Upon commencement of drilling, we will be providing both Harvest and Evrim shareholders and the commodities market in general, an in depth look at the property, our initial targets and our drilling strategy. Evrim’s audience is substantial and we look forward to updating them on Cerro Cascaron’s progress.

Evrim extends outcropping gold mineralization at Cuale and defines a new drill target over 1,000 metres northwest of La Gloria trenches

“The Phase 3 program has not only expanded both the surface extent and depth potential of the La Gloria prospect, but has defined new mineralized zones extending over 1,000 metres to the northwest”, commented Charles Funk, Evrim’s Vice President of New Opportunities and Exploration. “The breccia encountered at the North Dome contains abundant mineralized fragments indicating the potential for a gold rich mineralized body at depth.This presents a distinct drill target to be added to the upcoming drill program later in October.”

IMPACT Silver Samples 32.8g/t Gold over 1.0 meter at Santa Teresa Gold-Copper Area El Canelo averages 6.5 g/t Gold over 1.66 meters along 50 meter Strike Length

IMPACT Silver Corp. is pleased to provide an exploration update on continuing rock sampling in the Santa Teresa Area of the Royal Mines of Zacualpan District in central Mexico. Recent results from the El Canelo vein systems at Santa Teresa averaged 6.5g/t gold over a true width of 1.66 meters along a strike length of 50 meters. The system remains open for expansion and parallel vein systems in the area are being mapped and sampled at this time.

Telson Mining Corporation Campo Morado Update

Several scheduled upgrades were recently made in the mill processing plant installations, including among others: i) changing of ball mill liners with newly designed liners that allow for the replacement of the past 5″ ball that were being used, with 3” balls, which increases the life of the liners; ii) conducting a review of the primary jaw crusher and initiation of adaptations for the installation of a secondary cone crusher, which will reduce the size of the ore feed to the mill from -7″ to -2″; and iii) revising the cyclones classification system to reduce the circulating load in grinding. These changes are all aimed at increasing the grinding capacity of the mill to facilitate reaching managements target of processing up to 3,000 tpd by the end of 2018.

Mexus Gold US to commence core drilling on Julio Shear Zone at Santa Elana Project in Sonora MX

Mexus Gold US is pleased to announce funding has been secured and drilling will start Q4 on the 300 Meter portion of the 2.2km long strike along the Julio Shear Zone. Typical past shear zone assays have shown an average of 4 gr per ton gold and 20 to 30 gr per ton silver with areas of higher grades in the underground workings on the 30 Meter level of the Julio quartz vein showing Bonanza grade gold.

Kootenay Silver Reports Continued Exploration Success At Copalito Silver-Gold Project, Mexico

Kootenay President and CEO James McDonald states, “In this classic low sulfidation vein system it is very encouraging to see chip results returning 1,700 gpt, 1,030 gpt, 1,155 gpt silver with gold up to 1.2 gpt. These grades indicate potential for discovery of truly high-grade ore shoots. It is also positive that sampling is returning consistently anomalous silver and gold. The next stage of work will consist of continued mapping and detailed chip and panel sampling across the veins once the rainy season ends.”

Drill Turns at La Virginia Gold-Silver Project, Sonora, Mexico

Silver Viper’s President and CEO Steve Cope states, “The slow start to Phase I drilling has required patience. We are now extremely happy to be underway. The project has great potential and we look forward to advancing the exploration effort to include additional areas of interest in the claim areas.”

Radius Gold commences drilling at Amalia Project, Mexico

Radius Gold Inc. is pleased to announce that two drill rigs have arrived at the Amalia property and drilling has commenced at Radius’s high-grade gold-silver Amalia Project located in Chihuahua, Mexico. The drill program is operated by Radius and funded by Pan American Silver, under a joint venture agreement. Radius plans to drill test several high-grade gold and silver epithermal targets at Amalia in the coming months.

First Plomosas Ore Shipped for Sale

Brad Marwood CEO was at site for the first delivery to Santa Eulalia concentrator and said: “We are very pleased that our Mexican team established mining operations on-time, under budget and in a safe manner.”

SilverCrest Expands Las Chispas Inferred Resource 4.3 Million Tonnes at 3.68 gpt Au and 347 gpt Ag, or 623 gpt AgEq for 87 Million Oz AgEq; Includes 1.6 Million Tonnes at 1,091 gpt AgEq for 56 Million Oz AgEq

N. Eric Fier, CPG, P.Eng and CEO, remarked, “The delivery of this updated resource estimate is another major milestone for SilverCrest as we continue to systematically expand high-grade mineralization in the Las Chispas district. In the spring of 2018, we started our Phase III drill program with a Q3 target of 75 to 85 million ounces silver equivalent at a grade of around 600 gpt AgEq. With the recent expansion and discovery of multiple high-grade veins and zones, this target has been exceeded with an updated Inferred Resource of 4.3 million tonnes grading 623 gpt AgEq for an estimated 86.7 million AgEq ounces. The most exciting aspects of this resource update are the high-grade resources identified in the Area 51 zone of the Babicanora Vein and the Babicanora Norte Vein.”

All News