Category: Exploration and Development

Mithril Hits Bonanza Gold and Silver Grades at Copalquin Project

“We are extremely pleased to have intersected the high grade La Soledad vein with the first drill hole of the program and excited to report these bonanza grades for both gold and silver. The second hole located part of the old workings and also returned an excellent intersection from the footwall of the vein.”

Comet Resources – Santa Teresa Gold Project Acquisition Completion

Paul Ray, Director of El Alamo Resources Ltd and CEO of Raptor Capital International Ltd stated “The closing of the SPA represents an important first step in developing the Santa Teresa Gold Project into a high-grade operating gold mine. The acquisition by Comet adds a well credentialed Board and Management team that have over 50 years of combined exploration, development and mining expertise. The pending gold stream financing by Raptor, which is subject to definitive documents being finalised, is expected to fully fund the Project into production. We are looking forward to working together with the Comet team on this exciting Project.”

Update on Progress at Santa Elena Mine

“We’ve had normal ups and downs that any new miner experiences when implementing new processes. The crew at the mine have done a great job of adjusting and fixing issues as they’ve arisen. Mexus will continue to increase production each quarter,” CEO Paul Thompson, Sr.

GoGold Intersects 8.8m of 670 g/t Silver Equivalent at Los Ricos North

“At the La Trini target we’ve completed some short holes which have confirmed high grade silver and gold mineralization at surface. We will focus the drilling program this fall to confirm and expand on historical drilling and rapidly move towards defining the mineral resource of this deposit through grid drilling,” said Brad Langille, President and CEO.

Premier Announces Positive Re-start at Mercedes Mine

“During the temporary suspension of the operations during the second quarter, the Mercedes team developed a solid re-start strategy with a more focused mine plan, including reduced mill through-put resulting in lower costs and positive cash flow”, stated Peter van Alphen, Chief Operating Officer of Premier. “With continued exploration success, our goal is to gradually increase mill through-put back to the plant capacity of 2,000 tons per day.”

Advance Gold Begins Additional Geophysics on Its 3500 Metre Continuous Chargeability Anomaly at North End Where Anomaly Has a Hinge and Then Continues to Depth Beyond Detection Level for IP Survey

Allan Barry Laboucan, President and CEO of Advance Gold Corp. commented: “We are at an exciting juncture for the exploration of the Tabasquena project. Past geophysical work has identified a big geophysical anomaly, approximately 3500 metres horizontal, and at the point where it dips vertically, there is another 500 metres and the anomaly remains open.”

Discovery Reports 2,007 g/t AgEq Over 1.9 m and 1,073 g/t AgEq Over 1.3 m in Follow-Up Vein Drilling at Cordero

Taj Singh, President and CEO, states: “When we acquired Cordero a year ago, we identified more than 5 km strike extent of historic underground workings on veins as a distinct exploration target that had the potential to impact the Project. Our initial holes targeting these vein trends show significant promise and we have now made the decision to present results from these veins separately from drill hole results targeting the bulk-tonnage resource. With four drill rigs now active on site, we are focused on both expanding the higher-grade bulk-tonnage core of the deposit and systematically assessing the extensive vein trends.”

All News