Author: Josue Gomez

Alix Receives Additional Li Assays from the Tecolote Property, Electra Project, with 32% of Values Greater than 1,000 ppm

Mike England, president of Alix, stated: “We are very pleased with the continuing progress on the Agua Fria clay discovery, and continue to expand and refine targets. Along with our funding partner, Lithium Australia, we are looking forward to our maiden drill program on Li-rich targets in the first quarter 2017. The objective is to discover lithium-rich clay layers similar in grade to that of the Bacanora/REM La Ventana deposit.”

Americas Silver Corporation Provides Update on San Rafael Project and New York Stock Exchange Listing

Since the Board approval announced in September 2016, the Project continues to advance toward commercial production targeted in Q3 2017. Primary ramp development is advancing on schedule with approximately 25% completed and the Project received delivery of its new mobile equipment, including a new scoop and bolter. Progress is also being made in the refurbishment of other equipment transferred from the Nuestra Señora mining operations. The electrical substation has been energized and water storage facilities have been constructed. Please see the Company’s website at www.americassilvercorp.com for photos updating the Project’s status.

Santacruz Silver Announces Agreement to Sell San Felipe Project

“Our divestment of the San Felipe Project is the result of an internal analysis that identified the property as being a non-core asset at this time in light of the opportunity that exists at the Company’s recently established operating base in Zacatecas, Mexico. This strategic decision will allow the Company to further de-lever its balance sheet and accelerate our growth at the Veta Grande Project located in one of Mexico’s most recognized silver districts,” stated Arturo Prestamo, President and CEO. “The Company’s focus in 2017 will be to further optimize the operations at our two producing mines with the goal of increasing production levels and reducing costs.”

Prospero Stakes Epithermal Vein System in Hidalgo State, Mexico

Tawn Albinson, the President of Prospero said: “La Florida has been on our watch list since 2011. Our staking program there is a reflection of Prospero’s renewed commitment to its shareholders to aggressively pursue promising properties and build a first class portfolio of early stage projects for potential joint venture.

Telson Resources Inc. Announces Pre-Feasibility Study Completed for the Tahuehueto Gold-Silver-Lead-Zinc Project, Mineral Resource and Mineral Reserve Estimates

The Project configuration evaluated in the PFS is an owner-operated 790 tpd underground mine that will utilize overhand cut and fill mining with conventional mining equipment in a blast/load/haul operation. Mill feed will be processed in a 550 tpd comminution circuit consisting of primary and secondary crushing, grinding in a single ball mill followed by three floatation circuits producing lead, copper, and zinc concentrates. The concentrates will be trucked from site for smelting and refining.

SilverCrest Closes C$10 Million Bought Deal Financing

The net proceeds of the Offering will be used to continue Phase II of the exploration program at SilverCrest’s Las Chispas Property, for mineral property payments primarily related to the Las Chispas Property and for general corporate purposes.

Levon Resources provides Year End Update

Our earlier exploration illustrated that the Aida claim was at the center of the expanding Cordero resource, and that with additional drilling to focus on the higher grade mineralization that is evident in the dome, and potentially expand the resource, we could optimize the modeled open pit and improve our economic modeling for a mining operation. Our exploration team has just returned from Cordero and has spotted 28 holes for higher grade mineralization potential. The Company intends to pursue this exploration next year, once we see the price of silver move up in a sustained and positive way.

Jinchuan International enters Strategic Framework Agreement with Junhe Holdings

Jinchuan Group International Resources Co. Ltd. entered into a Strategic Framework Agreement with Junhe Holdings Limited in which Junhe Holdings will make equity investment in the Company by either subscribing for new shares of the Company or by acquiring existing shares of the Company, and establish several Joint Ventures in Shanghai with Junhe Holdings for different businesses, including a trading joint venture for trading commodities including non-ferrous metals, precious metals and chemical raw materials, a factoring joint venture and a financial leasing joint venture.

Canasil Reports Filing of Technical Report on SEDAR for the First Inferred Resource Estimate at the Sandra-Escobar Project in Durango, Mexico

Canasil Resources Inc. announces that Orex Minerals Inc. has filed with the System for Electronic Document Analysis and Retrieval a Technical Report in accordance with the rules of National Instrument 43-101 for the first Inferred Resource Estimate on the Boleras Silver Deposit at the Sandra-Escobar Project in Durango, Mexico. The project is being advanced by Orex under an option agreement with Canasil announced on September 15, 2015.

Hecla Receives Mining Industry’s Top Safety Certification

“We are pleased to be the first hardrock mining company to achieve certification under the CORESafety system,” said Phillips S. Baker, Jr., Hecla’s President and CEO. “This significant achievement is made possible by a commitment to safety exhibited at every level of our workforce, from the miners to site management and beyond.”

All News