Author: Josue Gomez

SilverCrest Closes Private Placement for $749,988

SilverCrest Metals Inc. is pleased to report that the non-brokered private placement of $749,988 announced January 3, 2018 with Christopher Ritchie has completed. The private placement, which closed on January 17, 2018, is comprised of 451,800 units at a price of Cdn$1.66 per unit for gross proceeds of Cdn$749,988. Each unit consists of one common share and one-half of one common share purchase warrant, with each whole warrant being exercisable for one common share of SilverCrest at a price of Cdn$2.29 per share for a term of two years. No finder’s fee was paid in connection with this placement.

Sierra Metals Reports 2017 Production Results and Announces 2018 Production, Cost, and Capex Guidance

Igor Gonzales, President and CEO of Sierra Metals, commented: “The Company ended 2017 with sound production due to a very strong performance at Yauricocha, where we continue to reap the benefits of a successful operational improvements program resulting in higher tonnages, in addition to higher-grade material discovered through our successful brownfield exploration programs.”

IMPACT Silver intersects 3.26 meters of 627 g/t Silver and finds new extension to San Ramon Mine at Zacualpan, Mexico

Fred Davidson, CEO, stated, “With these drill results we continue to successfully extend the San Ramon mineralizing system which is larger at depth than near surface. These results along with some historic holes, extends the mineralization 250 meters south of existing mine workings and 200m vertically up-dip representing potential additional mining areas for the San Ramon Mine. We have two underground drill stations almost ready from which we will test the further extension of the zone to depth and to the south.”

Evrim samples 9.4 metres grading 7.4 g/t gold in first trenching results from 100%-owned Cuale gold project

Charles Funk, VP of New Opportunities and Exploration commented, “That every trench displayed gold mineralization at such an early stage of exploration at Cuale is very encouraging. The reconnaissance trenching was undertaken in a core triangular area at the hilltop measuring 300 metres by 300 metres where strongly developed silicification correlates with high grades up to 48.5 g/t gold. Evrim is currently planning a follow-up program that includes further trenching and geophysics.”

Orla Mining Ltd. Announces Completion of Share Settlement

Orla Mining Ltd. announces that it has completed its previously-announced shares for debt settlement after being granted approval of the transaction by the TSX Venture Exchange. An aggregate of $206,783 in debt was extinguished through the issuance of an aggregate of 147,702 common shares of the Company at an issue price of $1.40 per common share. The issued common shares are subject to a four month hold period ending on May 18, 2018.

Galore Resources Enters Agreement to Begin Mining Los Gemelos

Galore Resources Inc. is pleased to announce that it has entered into a 5-year contract with Urbanizaciones Y Acabados, S.A. De CV “URBYASA” to mine gold at Galore’s 100% owned Los Gemelos claim. Management anticipates revenue from the mine going a long way toward satisfying the Company’s current and future overhead requirements. We are optimistic about Galore’s future and even though some consider this approach unconventional, we consider this a promising business strategy that should move this Company to an autonomous position. With a boost in demand due to significant production decreases in recent years, we feel our timing bodes well for increased gold prices.

Torex Announces Filing of Preliminary Base Shelf Prospectus

Torex Gold Resources Inc. announces that it has filed a preliminary short form base shelf prospectus with the Securities Commissions in each of the provinces and territories of Canada, except Québec. The base shelf prospectus will allow Torex to make offerings of up to $500 million of common shares, debt securities, subscription receipts, warrants and units or any combination thereof. When final, the base shelf prospectus will be effective for a 25 month period. The specific terms of any offering of Securities, including the use of proceeds from any offering, will be set forth in a shelf prospectus supplement. The Company has filed this base shelf prospectus to maintain financial flexibility but has no immediate intentions to undertake an offering.

New Gold Delivers on 2017 Production and Cost Guidance and Provides 2018 Outlook

Cerro San Pedro finished active mining and transitioned to residual leaching late in the second quarter of 2016. As a result, and consistent with expectations, the mine’s fourth quarter and full-year 2017 gold and silver production decreased compared to the prior year. 2017 full-year gold production was slightly below the guidance range of 35,000 to 45,000 ounces.

First Majestic drills 8.2 metres grading 11.5 g/t gold and 633 g/t silver at Ermitaño West

Charles Funk, VP of New Opportunities and Exploration commented, “We are very excited by the development of the Ermitaño West vein. Drilling to date has traced a zone that is 590 metres in strike and up to 210 metres deep with an average thickness of approximately 11 metres. Mineralization remains open at depth and to the west while the main shoot has demonstrated the presence of high gold and silver grades with the potential for significant additional mineralization and tonnage. According to First Majestic their plans for Ermitaño West in 2018 include 20,000 metres of drilling to define a resource, expand the extent of known mineralization and explore for additional veins in the area.”

All News