Author: Josue Gomez

Gran Entusiasmo Despertó la Conexión Mina Escuela 2018

Como parte de las actividades que integran el programa de la Reunión Internacional de Minería 2018, con sede en Zacatecas, la Asociación de Ingenieros de Minas Metalurgistas y Geólogos de México (AIMMGM) puso a disposición de la población estudiantil de la Universidad Autónoma de Zacatecas (UAZ), los centros dinámicos de simulación virtual para conocer los trabajos en minas.

Auxico Announces Discovery of Three Historical Mines at Zamora Silver-Gold Property, Sinaloa, Mexico

Auxico Resources Canada Inc. (CSE:AUAG) is pleased to announce that the Company has discovered three historical mines containing unrecognized shafts and pits located along the Zamora Vein, including the La Campeona mine, which returned 30 cm of 10.1 g/t gold and 941.7 g/t silver. These discoveries extend the Zamora Vein and the parallel El Obatel Vein over a strike length of at least 800 metres. The Zamora Silver-Gold Property located in Sinaloa, Mexico, and is 100% owned by Auxico Resources Canada.

Almaden Exploration Drilling Hits 26.00 Meters of 1.93 g/t Gold Including 1.00 m of 27.50 g/t Gold Approximately 1.2 km South West of PFS Pit at the Ixtaca Project Mexico

J.D. Poliquin, chairman of Almaden stated, “These further results demonstrate the potential for an important new mineralised zone well outside of the PFS pit and resource area. These results also show the potential for further discoveries within the project area and for the Ixtaca mine plan to grow with continued exploration. Ongoing drilling will continue to seek more such zones even as the engineering work and the Feasibility Study progress.”

Colibri Resource Corporation Announces Second Batch Results from Drilling at Pilar Gold Project

Colibri Resource Corporation (CBI: TSX-V) wishes to announce assay results from 16 more holes completed on its Phase 1 reverse circulation drilling program on its 100% owned Pilar Gold Project in Sonora, Mexico. Results include an intersection of 5.37 grams per tonne Au over an intersection length of 3.0 meters in hole JES-18-19 which was part of a longer intersection of 40.5m of 0.73 g/t.

Santacruz Silver Reports First Quarter 2018 Production Results

“During Q1 of 2018 management focussed activities on aggressively developing the Veta Grande main ramp in order to access in situ mineralized material from Q3 onwards. This strategy has resulted in lower head grades and reduced metal production for the short run but will pave the way for achieving targeted production for Q3 and beyond.” stated Arturo Prestamo.

Excellon DrillS 3,428 g/t Silver Equivalent Over 10.2 Metres At Platosa

Excellon Resources Inc. (TSX:EXN, EXN.WT, EXN.WT.A; OTC:EXLLF). “As with our previously announced results, drilling underground continues to increase our confidence in the resources and expand our footprint at Platosa,” stated Ben Pullinger, Senior Vice-President Geology. “Definition drilling ahead of current mine workings allows for continued de-risking of future production allowing for better visibility on planning. In particular, the widths intersected in the Pierna Manto are better than expected or predicted in the current resource model.”

Zacatecas busca innovar con la Reunión Internacional de Minería 2018

Del 6 al 8 de junio, en las instalaciones del Centro de Convenciones de Zacatecas se realizará la Expo Minera, donde se abordarán temas técnicos en materia de explotación de suelos, y se dará paso a un encuentro entre inversionistas que permitan abrir oportunidades de negocios entre las empresas especializadas. En este evento participará la Embajada de Australia en México, e industrias mineras de Chile, España y Suecia que propiciarán el contacto con el capital mexicano.

53.8g/t Gold & 2.82% Cobalt Drilled at Sara Alicia

Azure Minerals Limited (ASX: AZS) is pleased to advise that followup diamond drilling has intersected additional high-grade gold and cobalt mineralisation on its 100%-owned Sara Alicia project, located in Sonora State, Mexico.

Minaurum Closes Oversubscribed $7M Private Placement

Minaurum Gold Inc. is pleased to announce that it has closed the final tranche of its previously announced oversubscribed private placement raising $1,382,248.35. Minaurum has now raised total gross proceeds of $7,084,747.80.

All News