Fresnillo Plc – Fourth Quarter Production Report for the Three Months ended 31 December 2025
Fresnillo plc’s 4Q25 Production Report (28 Jan 2026): Q4 silver output 12.2 moz (+5.9% QoQ, -8% YoY); full-year 48.7 moz (down 13.5% YoY, met guidance). Gold Q4 135.3 koz (down YoY); full-year 600.3 koz (beat guidance). 2026 silver and gold guidance reduced due to mine plan changes and lower grades.











