Year: 2024

Prismo Metals Mobilizes for Palos Verdes Drilling

“We are eager to resume tracing the high-grade mineralization we’ve cut previously in the Palos Verdes vein by taking advantage of better hole geometry created by drilling from our Strategic Partner Vizsla Silver’s ground,” said Dr. Craig Gibson, Chief Exploration Officer of the Company.

New Gold-Silver Discovery Announced on Orogen’s Ermitaño Royalty Area of Interest

Paddy Nicol, Orogen’s CEO, commented, “The discovery of the Navidad vein system has strong implications for significantly extending the life of the Ermitaño Mine and for Orogen’s 2% NSR royalty. Only seven holes have been completed in the Navidad vein, but the scale of the discovery is already apparent with high grade gold intercepts that are approximately 750 metres apart.”

First Majestic Announces New High-Grade Gold and Silver Discovery at Santa Elena

“We are very excited about the new high-grade gold and silver system, Navidad; this is the most promising discovery at the Santa Elena property since Ermitaño was discovered in 2016. Four drill rigs are currently focused on this area, which appears to have the potential to expand as it is open in all directions”, stated Keith Neumeyer, President & CEO of First Majestic.

Sonoro Gold Corrects Disclosures Related to its Cerro Caliche Project in Mexico

Sonoro Gold Corp. is issuing the following news release as a result of a review by the British Columbia Securities Commission to correct potentially misleading disclosures contained in corporate presentations posted on the Company’s website and emails distributed to an investor relations contact list, related to its Cerro Caliche project located in the municipality of Cucurpe, Sonora, Mexico, held by the Company’s Mexican subsidiary, Minera Mar De Plata, S.A. de C.V.

Sierra Madre Announces First Silver-Gold Concentrate Shipment

Sierra Madre Gold and Silver Ltd. is pleased to announce first shipments of silver and gold concentrates from the 100% owned Guitarra Mine Complex located in Estado de Mexico, Mexico. On July 25, 2024 the Company shipped 90.68 dry metric tonnes which contained approximately 3,000 grams of silver and 30 grams gold per DMT.

Torex Gold Provides Q2 2024 Update on Media Luna Project

“Development of Media Luna continues to track to schedule, with first production of copper concentrate anticipated by year end and commercial production expected in Q1 2025. As at the end of June, Media Luna was 78% complete across engineering, procurement, underground development/construction, and surface construction, compared to 69% at the end of March.

Infinitum Provides Update on Progress at La Adelita and Hot Breccia Project

The Company is excited to be mobilising equipment during the week beginning 29th July 2024. These preliminary works will provide access to the Cerro Grande adit. Once the historic adit can be accessed a mining contractor will be engaged to drive a 100m long 3 metre x 3 metre access tunnel to the mineralised body.

All News