
Silver Rally: What’s Happening to Miners Now? Guanajuato Silver Interview

Kingsmen Resources Targets Major Silver and Gold Discoveries in Mexico

OTCQX Best 50 Virtual Investor Conference – Guanajuato Silver Co Ltd. (OTCQX: GSVRF | TSXV: GSVR)

Heliostar Metals Ltd. (OTCQX: HSTXF | TSXV: HSTR): Virtual Investor Conferences

The Hidden Returns in Junior Mining | John-Mark Staude

I Asked Rick Rule a Question the Mining Industry Keeps Avoiding | PDAC 2026 Part 1/3
Vortex Metals Attends the 26th Munich Equity Investment Conference
GoGold Announces 2026 Annual Production
Heliostar Submits Environmental Permit Applications for Ana Paula

Silverco Mining Intercepts 1,280 g/t Silver over 3.35 Metres True Width at Its 100%-Owned Cusi Mine in Chihuahua, Mexico
Silverco reported results from 15 holes in its 30,000-metre Cusi drilling program in Chihuahua. Highlights include 1,222 g/t AgEq over 3.35 metres true width at Promontorio and 737 g/t AgEq over 4.18 metres. Drilling targets resource growth ahead of a planned Q4 2026 restart and H1 2027 resource update.

Guanajuato Silver Completes San Ignacio to Bolanitos Connection Tunnel
Guanajuato Silver completed a 267-metre underground ramp connecting the San Ignacio and Bolanitos mines. The breakthrough occurred September 30, ahead of schedule. The link is expected to shorten ore-haulage times to Bolanitos’ processing plant and improve integration between the operations.
Oroco Drills 234.6 metres of 0.52% CuEq at Santo Tomás
Oroco reported Phase 2 assays from 10 Santo Tomás drill holes, including S045’s 234.6 m grading 0.52% CuEq. South Zone resource drilling is complete after 50 holes totaling 15,263 m; Pillar Zone and geotechnical drilling continue. Results may inform the planned resource update and prefeasibility study; no resource increase is yet established.
Algo Grande Copper Core Testing Shows Mineralized Skarn is Denser and More Chargeable Than Host Rocks; Ground Gravity Survey to Begin at Adelita
Testing of 18 selected Cerro Grande core samples found mineralized skarn denser and more chargeable than the tested host rocks. Algo Grande plans a 1,296-station gravity survey at Adelita to refine exploration targets. Drill hole AG-CG-PH2-003 intersected skarn with visible copper sulfides; assays are pending.
Sonoro Gold Announces Continued Expansion of Higher-Grade Mineralization at Cerro Caliche
Sonoro Gold reported results from 26 additional holes at Cerro Caliche, Sonora, expanding mineralization at Diana and outlining the La Colorada zone. Highlights include 28.95 metres grading 2.598 g/t gold and 47.24 metres at 1.552 g/t gold. The ongoing 50,000-metre campaign has completed 14,086 metres in 72 holes. True widths are estimated at 60–90% of drilled lengths. globenewswire.com
Masivo Silver Reports Broad Polymetallic Mineralization from Initial 2026 Drilling Program at Cerro Colorado Project, Sonora, Mexico
Masivo Silver’s first 2026 hole at Cerro Colorado, Sonora, intersected 32.5 metres grading 0.271% zinc, 7.0 g/t silver and 0.141% lead, plus copper and gold. Drilling stopped at 259.5 metres due to technical difficulties while still in mineralized rhyolitic porphyry. Grades strengthened near the bottom, supporting follow-up drilling. True widths remain unknown.
Centenario Gold Announces the Start up of it’s Maiden Drill Program at the Los Reyes Copper, Moly, Gold Skarn System
Centenario Gold has begun a maiden 1,500-metre drill program at Los Reyes, Chihuahua, comprising five to six holes, 200–500 metres deep. Drilling targets depth extensions of skarn mineralization beneath the historic Jibosa and Tueda workings. Previous underground sampling returned up to 27.9% copper at Jibosa and 2.1% molybdenum at Tueda.
Torex Gold Provides Q3 2026 Morelos Drilling & Exploration Update
Torex reported strong drilling across its Morelos property in Guerrero. Highlights include 31.2 m at 11.28 g/t gold equivalent in the emerging San Miguel corridor and 35.0 m at 14.32 g/t at ELG Underground. Torex added 13,400 m of Media Luna Cluster drilling, raising its 2026 Morelos exploration budget to US$51 million.
Torex Gold Provides Q3 2026 Morelos Drilling & Exploration Update
Torex reported high-grade results from 15-rig drilling across Morelos, including 11.28 g/t AuEq over 31.2 m along the emerging San Miguel corridor and 56.8 g/t AuEq over 6.4 m at ELG Underground. The company raised its 2026 exploration budget to US$51 million; a reserve and resource update is expected in March 2027.
Minaurum Resource Step-Out Drilling Returns: 3.40 m of 397 g/t AgEq at Europa Sur, 1.90 m of 323 g/t AgEq at Quintera, and 0.90 m of 1469 g/t AgEq at San Jose in Alamos Silver Project
Minaurum reported step-out results from its Alamos Silver Project in Sonora, including 3.40 m at 397 g/t silver equivalent at Europa Sur, 1.90 m at 323 g/t at Quintera, and 0.90 m at 1,469 g/t at San Jose. The results support its ongoing 50,000 m resource expansion program; Quintera and Europa Sur were excluded from the initial resource estimate.
Algo Grande Copper Confirms 68.43 Metres of Copper-Silver-Gold Mineralization Across Two Zones in Hole AG-CG-PH2-002, Including a New Zone of 38.20 Metres at 1.0% CuEq
Algo Grande’s hole AG-CG-PH2-002 at Adelita in Sonora intersected two separate copper-silver-gold skarn zones totaling 68.43 metres at an average 1.2% CuEq. The newly reported lower zone returned 38.20 metres at 1.0% CuEq, about 67 metres below the previously reported upper zone. Intervals are downhole lengths; true widths and metallurgical recoveries remain undetermined.
Tocvan Expands El Mezquite; Drilling Returns 106.8 m of 0.5 g/t Au
At its Gran Pilar project in Sonora, Tocvan drilled 106.8 m grading 0.50 g/t gold and 3.5 g/t silver within a broader 271.5 m interval. The hole extends El Mezquite mineralization 130 m north of the discovery hole. The trend is now traced for about 1.4 km and remains open.
Kingsmen Intersects 218g/t AgEq over 6.5 Meters on New Structure, 150 Meters West of High-Grade Hole LC-25-010
Kingsmen Resources reported 218 g/t silver equivalent over 6.45 metres at its Las Coloradas project in Chihuahua, including 338 g/t over 1.95 metres. The hole intersected the newly identified #8 structure, 150 metres west of an earlier high-grade drill hole, adding evidence of mineralization across multiple structures.
Canuc Closes $5.99 Million Private Placement to Accelerate East Sudbury Development and Exploration
Canuc closed a C$5.988 million private placement, issuing 4.99 million units at C$1.20 each. Each unit includes one share and half a warrant; whole warrants are exercisable at C$1.80 for two years. Proceeds will fund engineering, mine planning and drilling at East Sudbury, plus exploration studies at San Javier.
Vortex Metals Attends the 26th Munich Equity Investment Conference
Vortex Metals President Thibault White presented the company’s Chilean and Mexican exploration projects to investors at Munich’s 26th Equity Investment Conference, discussing strategy, financing and project timelines. Separately, Vortex granted an officer 500,000 options at C$0.05, vesting quarterly over 12 months and expiring in five years.
GoGold Announces 2026 Annual Production
GoGold reported fiscal 2026 production of about 1.86 million silver-equivalent ounces, including 1 million ounces of silver, up 18% year over year. Parral’s September-quarter output rose 11% sequentially. Year-end cash reached US$288 million despite Los Ricos South construction spending, and construction is progressing as planned.
First Majestic Announces Temporary Suspension of NAFTA Arbitration Proceedings as Settlement Framework Agreed to with Mexico
First Majestic and Mexico agreed in principle to a framework resolving the legacy tax dispute involving subsidiary Primero Empresa Minera. The arbitration tribunal suspended proceedings through December 31, 2026, while the settlement is finalized; the parties may seek an extension into Q1 2027. If settlement fails, First Majestic may resume arbitration.
Mining Americas Reports Third Quarter 2026 Gold Production and Provides Notice of Third Quarter Results and Conference Call
Mining Americas reported 7,915 oz of Q3 gold production and 7,620 oz sold at its Pan mine in Nevada, bringing 2026 year-to-date output to 24,786 oz. Production matched plan, and 2026 guidance remains 32,000–38,000 oz. Quarter-end cash was US$36 million, following a US$5.3 million Cerro de Oro permit payment.
Heliostar Submits Environmental Permit Applications for Ana Paula
Heliostar submitted an environmental impact statement (MIA-R) and environmental risk study (ERA) to SEMARNAT for the proposed underground Ana Paula project. The plan would reduce surface disturbance by about 65% compared with the previously approved open-pit plan. Heliostar targets a construction decision for mid-2027.
Equinox Gold Reports Q3 Production Results Following Transformational Combination with Orla; Expanded Canadian Production Platform Positioned for Strong Finish to 2026
Equinox Gold produced 237,019 oz of gold in Q3 and 611,483 oz year to date after completing its Orla combination, which added Musselwhite and Camino Rojo. It remains on track for 2026 guidance of 870,000–920,000 oz (about 1.1 million including Orla’s full-year contribution); Canadian operations are expected to strengthen into year-end. Equinox Gold
McEwen Signs US$55 Million Agreement to Sell Fuller and Paymaster
McEwen agreed to sell its Fuller property, 60% Paymaster interest and a Timmins surface parcel to Discovery subsidiary Dome for US$55 million—US$5 million cash and US$50 million in Discovery shares, subject to customary approvals. Separately, it received US$13.5 million by assigning a McEwen Copper loan receivable, bringing expected additional growth capital to about US$68.5 million.
Mobile View

Silverco Mining Intercepts 1,280 g/t Silver over 3.35 Metres True Width at Its 100%-Owned Cusi Mine in Chihuahua, Mexico
Silverco reported results from 15 holes in its 30,000-metre Cusi drilling program in Chihuahua. Highlights include 1,222 g/t AgEq over 3.35 metres true width at Promontorio and 737 g/t AgEq over 4.18 metres. Drilling targets resource growth ahead of a planned Q4 2026 restart and H1 2027 resource update.

Guanajuato Silver Completes San Ignacio to Bolanitos Connection Tunnel
Guanajuato Silver completed a 267-metre underground ramp connecting the San Ignacio and Bolanitos mines. The breakthrough occurred September 30, ahead of schedule. The link is expected to shorten ore-haulage times to Bolanitos’ processing plant and improve integration between the operations.

Oroco Drills 234.6 metres of 0.52% CuEq at Santo Tomás
Oroco reported Phase 2 assays from 10 Santo Tomás drill holes, including S045’s 234.6 m grading 0.52% CuEq. South Zone resource drilling is complete after 50 holes totaling 15,263 m; Pillar Zone and geotechnical drilling continue. Results may inform the planned resource update and prefeasibility study; no resource increase is yet established.

Algo Grande Copper Core Testing Shows Mineralized Skarn is Denser and More Chargeable Than Host Rocks; Ground Gravity Survey to Begin at Adelita
Testing of 18 selected Cerro Grande core samples found mineralized skarn denser and more chargeable than the tested host rocks. Algo Grande plans a 1,296-station gravity survey at Adelita to refine exploration targets. Drill hole AG-CG-PH2-003 intersected skarn with visible copper sulfides; assays are pending.

Sonoro Gold Announces Continued Expansion of Higher-Grade Mineralization at Cerro Caliche
Sonoro Gold reported results from 26 additional holes at Cerro Caliche, Sonora, expanding mineralization at Diana and outlining the La Colorada zone. Highlights include 28.95 metres grading 2.598 g/t gold and 47.24 metres at 1.552 g/t gold. The ongoing 50,000-metre campaign has completed 14,086 metres in 72 holes. True widths are estimated at 60–90% of drilled lengths. globenewswire.com

Masivo Silver Reports Broad Polymetallic Mineralization from Initial 2026 Drilling Program at Cerro Colorado Project, Sonora, Mexico
Masivo Silver’s first 2026 hole at Cerro Colorado, Sonora, intersected 32.5 metres grading 0.271% zinc, 7.0 g/t silver and 0.141% lead, plus copper and gold. Drilling stopped at 259.5 metres due to technical difficulties while still in mineralized rhyolitic porphyry. Grades strengthened near the bottom, supporting follow-up drilling. True widths remain unknown.
Canuc Closes $5.99 Million Private Placement to Accelerate East Sudbury Development and Exploration
Canuc closed a C$5.988 million private placement, issuing 4.99 million units at C$1.20 each. Each unit includes one share and half a warrant; whole warrants are exercisable at C$1.80 for two years. Proceeds will fund engineering, mine planning and drilling at East Sudbury, plus exploration studies at San Javier.
Vortex Metals Attends the 26th Munich Equity Investment Conference
Vortex Metals President Thibault White presented the company’s Chilean and Mexican exploration projects to investors at Munich’s 26th Equity Investment Conference, discussing strategy, financing and project timelines. Separately, Vortex granted an officer 500,000 options at C$0.05, vesting quarterly over 12 months and expiring in five years.
GoGold Announces 2026 Annual Production
GoGold reported fiscal 2026 production of about 1.86 million silver-equivalent ounces, including 1 million ounces of silver, up 18% year over year. Parral’s September-quarter output rose 11% sequentially. Year-end cash reached US$288 million despite Los Ricos South construction spending, and construction is progressing as planned.
First Majestic Announces Temporary Suspension of NAFTA Arbitration Proceedings as Settlement Framework Agreed to with Mexico
First Majestic and Mexico agreed in principle to a framework resolving the legacy tax dispute involving subsidiary Primero Empresa Minera. The arbitration tribunal suspended proceedings through December 31, 2026, while the settlement is finalized; the parties may seek an extension into Q1 2027. If settlement fails, First Majestic may resume arbitration.

Silver Rally: What’s Happening to Miners Now? Guanajuato Silver Interview

Kingsmen Resources Targets Major Silver and Gold Discoveries in Mexico

OTCQX Best 50 Virtual Investor Conference – Guanajuato Silver Co Ltd. (OTCQX: GSVRF | TSXV: GSVR)

Heliostar Metals Ltd. (OTCQX: HSTXF | TSXV: HSTR): Virtual Investor Conferences

The Hidden Returns in Junior Mining | John-Mark Staude

I Asked Rick Rule a Question the Mining Industry Keeps Avoiding | PDAC 2026 Part 1/3
Our company BYLSA DRILLING provides drilling services in a variety of environments, ranging from typical exploration sites to extreme topographic conditions, always with the highest quality and safety standards.









