12.4 m at 2.64 g/t Au, including 0.4 m at 57.9 g/t Au

VANCOUVER, BC, Dec. 13, 2022 /CNW/ –  GR Silver Mining Ltd. (“GR Silver Mining” or the “Company“) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to announce additional drilling results in the Plomosas Mine Area as part of the 2022 infill drilling and sampling program at the Company’s wholly-owned Plomosas Project in Sinaloa, Mexico. The drilling had two objectives:

  • Drilling at specific locations inside the historic mine where previous resource modelling and estimation adopted zero grades for unsampled core intervals from historical drilling, and
  • Define the geometry and boundaries of new gold mineralization on the hanging wall of the main mineralized zone at lower levels of the underground mine.

The Company expects anticipated drilling in the Plomosas Mine Area to be completed by the end of December 2022 for data to be incorporated into the 3D geological model, for the updated resource estimation expected to be published in Q1|2023.

Highlights from the Plomosas Mine Area drill holes (Down hole widths):

  • PLIP22-28: 7.3 m at 1,242 g/t AgEq[1] (55 g/t Ag, 8.66 g/t Au, 2.7% Pb, 6.6% Zn and 0.5% Cu) 
  • PLI17-26:    12.4 m at 2.64 g/t Au, including 0.4 m at 57.9 g/t Au
  • PLI22-42:    21.1 m at 489 g/t AgEq (28 g/t Ag, 3.60 g/t Au, 0.6% Pb, 2.3% Zn and 0.2% Cu)
  • PLI22-47:    7.1 m at 970 g/t AgEq (281 g/t Ag, 2.15 g/t Au, 8.9% Pb and 6.0% Zn)
  • PLI22-46:    6.4 m at 940 g/t AgEq (44 g/t Ag, 1.90 g/t Au, 11.2% Pb, 10.0% Zn and 0.1% Cu)

The infill drilling program at the Plomosas Mine Area continues to provide information for the Company to enhance the geological model and confirm the presence of high-grade structures on the hanging wall and footwall of the main mineralized breccia. Gold mineralized zones exceeding 20 m down hole width have been drilled in the current program in both the hanging wall and footwall. Multiple drill hole intervals with high-grade veinlets have been intersected in these zones, as evidenced by the 0.4 m at 57.9 g/t Au from hole PLI17-26.

GR Silver Mining Chairman and CEO, Eric Zaunscherb comments, “As GR Silver’s team peeled the geological onion, the importance of cross structures in the overall Plomosas story was revealed. Our most recent results confirm that younger, crosscutting structures appear to be contributing additional precious metals mineralization in the main polymetallic Plomosas Breccia and beyond into its hanging wall and footwall. The intersection of high-grade gold mineralization is an important addition to the Plomosas story that may contribute to the resource update anticipated in the next few months. Regardless, the emerging understanding of controls on high-grade mineralization has already had a material impact on drilling success at the Plomosas Project, as well as how the project is viewed.”

Figure 1:   Longitudinal Section: Plomosas Mine Area (Au Block Model and Grades) (CNW Group/GR Silver Mining Ltd.)
Figure 1:   Longitudinal Section: Plomosas Mine Area (Au Block Model and Grades)

GR Silver Mining will complete the infill drilling program at the Plomosas Mine Area by year end to receive the assays in early 2023. Upon completion, this program will add 11,750 m of core drilling (186 holes) in specific areas of the existing NI 43-101 resource block model, designed to:

  • Replace historical holes in the previous resource estimation where zero grades were applied due to historical selective sampling. The immediate benefit is that infill drilling completed in the Plomosas Breccia, as well as exploring further into the hanging wall and footwall of the main mineralized zone, may potentially enhance the silver (“Ag”) and gold (“Au”) grade distribution in the upcoming resource block model;
  • Target the discovery and delineation of high-grade precious metal mineralized zones hosted by structures cross cutting the main mineralized zone;
  • Drill in the vicinity of the main Ag-Au-Pb-Zn breccia in a series of unmined locations inside the historical Plomosas Mine Area, where recent structural geological mapping revealed new structures hosting wide mineralization close to existing underground development; and
  • Test new models developed following the first-ever detailed geological-structural mapping on the Plomosas Mine Area with potential to successfully intersect additional high-grade Ag-Au mineralized zones.

The highlights of the drill holes reported in this news release are summarized as follows.

Table 1:  Plomosas Mine Area – Latest Results Highlights

Drill HoleFrom(m)To(m)Apparent width (m)Truewidth(m)Ag g/tAu g/tPb %Zn %Cu %AgEq g/t
PLI22-400.05.85.83.3250.240.60.70.197
PLI22-4168.369.20.90.5230.250.83.00.2204
PLI22-420.027.327.320.9431.961.22.10.3369
including16.125.99.87.5614.522.95.50.3802
54.475.521.110.6283.600.62.30.2489
including54.457.02.62.04611.050.23.70.41,263
and57.959.51.60.8877.133.48.30.21,184
and62.365.73.41.7423.900.31.20.2479
and72.475.53.11.5286.050.71.90.1695
PLI22-4315.619.13.52.560.100.54.8na
PLI22-44No significant intervals
PLI22-450.04.44.43.3140.140.41.9na114
including0.02.42.41.880.200.53.1na166
PLI22-462.68.06.44.9441.9011.210.00.1940
including5.28.02.81.9644.0219.517.00.11,659
PLI22-4762.169.27.12.42812.158.96.0na970
PLI22-5125.328.12.81.620.070.11.3na
117.6121.74.12.4140.031.50.1na67
PLIP22-17No significant intervals
PLIP22-280.07.37.36.9558.662.76.60.51,242
PLIP22-39A0.04.34.33.7572.2311.29.80.1969
PLIP22-443.111.78.67.4240.912.43.70.1329
including3.15.42.32.0462.824.26.50.2700
14.017.33.32.5150.372.93.30.1269
PLIP22-477.814.87.16.8120.281.32.70.3211
PLIP22-483.89.05.24.0400.080.20.30.174
12.720.07.46.4340.150.20.40.174
PLIP22-498.812.73.92.5250.110.40.20.164
PLIP22-503.54.51.00.87520.641.92.40.2973
PLIP22-510.42.42.01.4730.671.62.30.4315
PLIP22-521.08.07.05.4180.605.14.40.1399
including3.04.51.51.0682.4421.918.40.11,644
PLIP22-536.610.03.43.4190.130.20.10.155
PLIP22-54No significant intervals
PLIP22-550.01.31.31.1770.549.63.50.4583
1.312.611.38.721.34na0.1na
PLIP22-56No significant intervals
PLIP22-573.614.811.210.5620.02na0.1na69
including14.514.80.30.25820.030.10.1na590
PLIP22-58No significant intervals
PLIP22-590.05.05.04.3221.253.73.60.1387
including0.02.02.01.3492.708.98.20.1878
PLI17-26 #17.630.012.410.732.640.10.1na257
including29.530.00.50.43957.902.20.10.25,519

Numbers may be rounded. Results are uncut and undiluted.  “na” = no significant result. # Existing previously unsampled core assayed after identification of new Au mineralized structures in nearby underground workings. * AgEq calculations using US$20.00/oz Ag, US$1,600/oz Au, US$0.90/lb Pb, US$1.10/lb Zn and US$3.00/lb Cu, with metallurgical recoveries of Ag – 74%, Au – 86%, Pb – 69%, Zn –75% and Cu – 80%. AgEq = ((Ag grade x Ag Price x Ag recovery) + (Au grade x Au price x Au recovery) + (Pb grade x Pb price x Pb recovery) + (Zn grade x Zn price x Zn recovery) + (Cu grade x Cu price x Cu recovery))/(Ag price x Ag recovery) .

Table 2:   Plomosas Mine Area Drill Hole Details

Drill HoleEast (m)North (m)RL (m)Dip (˚)Azimuth (˚)Depth (m)Drill Hole Type
PLI22-40451,1092,551,798705-86050.8Underground
PLI22-41451,0402,551,675739-5113996.5Underground
PLI22-42451,1192,551,852700-729450.0Underground
PLI22-43451,1142,551,923694-459763.0Underground
PLI22-44451,0852,551,906691-459060.0Underground
PLI22-45451,0022,551,847678-10120114.0Underground
PLI22-46451,0272,551,700727-65250131.2Underground
PLI22-47451,1092,551,798705-86050.8Underground
PLI22-51451,0402,551,675739-5113996.5Underground
PLIP22-017451,2122,552,002769-37806.00Underground
PLIP22-28451,0442,551,898677-408017.25Underground
PLIP22-39A451,0642,551,880681-709017.0Underground
PLIP22-44450,9922,551,878677-554218.3Underground
PLIP22-47451,0512,551,871706-4813818.0Underground
PLIP22-48451,1322,551,764730-3911020.0Underground
PLIP22-49451,0872,551,746731-406521.0Underground
PLIP22-50451,3642,551,690860-1821015.0Underground
PLIP22-51451,5082,552,236888-478012.5Underground
PLIP22-52451,0722,551,903690-459013.1Underground
PLIP22-53451,0892,551,744732-405014.3Underground
PLIP22-54451,5042,552,2388903527018.0Underground
PLIP22-55451,2612,551,987787-6411415.3Underground
PLIP22-56451,2002,551,754763-558415.4Underground
PLIP22-57451,1592,551,683757-454015.4Underground
PLIP22-58451,4942,552,2378803530513.5Underground
PLIP22-59451,5322,552,238895-6731016.3Underground
PLI17-26450,9332,551,78875200279.95Underground

Note: WGS84 Datum

QA/QC Procedures

The Company has implemented QA/QC procedures which include insertion of blank, duplicate and standard samples in all sample lots sent to SGS de México, S.A. de C.V. laboratory facilities in Durango, Mexico, for sample preparation and assaying. For every sample with results above Ag >100 ppm (over limits), these samples are submitted directly by SGS de Mexico to SGS Canada Inc. at Burnaby, BC. The analytical methods are four acid Digest and Inductively Coupled Plasma Optical Emission Spectrometry with Lead Fusion Fire Assay with gravimetric finish for silver above over limits. For gold assays the analytical methods are Lead Fusion and Atomic Absorption Spectrometry Lead Fusion Fire Assay and gravimetric finish for gold above over limits (>10 ppm).

Qualified Person

The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is Marcio Fonseca, P. Geo., President & COO for GR Silver Mining, who has reviewed and approved its contents.

About GR Silver Mining Ltd.

GR Silver Mining is a Canadian-based, Mexico-focused junior mineral exploration company engaged in cost-effective silver-gold resource expansion on its 100%-owned assets, located on the eastern edge of the Rosario Mining District, in the southeast of Sinaloa State, Mexico. GR Silver Mining controls 100% of two past producer precious metal underground and open pit mines, within the expanded Plomosas Project, which includes the integrated San Marcial Area and La Trinidad acquisition. In conjunction with a portfolio of early to advanced stage exploration targets, the Company holds 734 km2 of concessions containing several structural corridors totaling over 75 km in strike length.

GR Silver Mining Ltd.

Eric Zaunscherb, Chairman & CEO   

For further information, please contact:
Brenda Dayton, VP Corporate Communications
Telephone: +1.604.417.7952
Email: [email protected]                 

Cautionary Statement Regarding Forward-Looking Information

This press release contains “forward-looking statements” within the meaning of applicable Canadian securities legislation and information that are based on the beliefs of management and reflect the Company’s current expectations. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. Such statements and information reflect the current view of the Company. Risks and uncertainties may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

SOURCE GR Silver Mining Ltd.

Original Article: https://www.newswire.ca/news-releases/gr-silver-mining-intersects-high-grade-gold-on-the-hanging-wall-in-plomosas-mine-area-805314605.html

SHARE THIS POST?

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email

Maza Drilling is a Mexican company established in 2007 in Mazatlán, Sinaloa. Our Canadian founder, Mr. Guy de Launiere, has over 20 years of international experience managing diverse drilling operations. Maza Drilling strives to compete at the highest levels in terms of recovery, effectiveness, efficiency, and affordability at every project while keeping at the forefront of technology to meet our customer’s needs in this demanding market.