Location

CALGARY, ALBERTA, May 21, 2015 (Marketwired via COMTEX) — BACANORA MINERALS LTD. ("Bacanora" or the "Company") (BCN)(aim:BCN) is pleased to announce assay results from a total of 2,946 metres of drilling in 22 holes recently completed on its wholly-owned La Ventana concession, as well as one hole drilled on the Fleur(1) concession. Both concessions are held as part of the Company's Sonora Lithium Project in Mexico. The lithology from these drill results were included in the updated Mineral Resource Estimate ("MRE") announced by the Company on May 13, 2015. Accompanying this release is a map with these drill holes highlighted.

Highlights:

--  Intercepts of the Upper Clay range from 26.10 to 50.83 metres in length
    and those for the Lower Clay range from 12.98 to 23.57 metres on La
    Ventana.
--  Analyses received for 18 of the 22 holes indicate that the lithium
    content of both Upper and Lower clays increases to the south on La
    Ventana, as well as maintaining grade and thickness down dip at depth.
    In particular:
    --  Weighted averages for lithium content in the Upper Clay Unit varies
        from 955 ppm Li (0.5% LCE(2)) over 41.6 metres (hole LV-19) to 3,215
        ppm Li (1.7% LCE) over 17.48 metres (hole LV-27).
    --  For the Lower Clay Unit, lithium content varies from 1,143 ppm Li
        (0.6% LCE) over 19.20 metres (hole LV-18) to 5,830 ppm Li (3.1% LCE)
        over 20.42 metres (LV-27).
    --  Individual 1.5 metre long samples of clay range up to 10,000 ppm(3)
        Li (5.32% LCE).
--  The single hole drilled on the Fleur concession intersected 7.16 metres
    of the Upper Clay unit, which averaged 3,107 ppm Li (1.7% LCE) and 25.30
    metres of the Lower Clay, which averaged 4,242 ppm Li (2.3% LCE).


Peter Secker, CEO of Bacanora, commented, "These assay results have confirmed the recently published MRE for the project, with an estimated 1.12 million tonnes ("Mt") LCE contained in 95 Mt of clay, at Li grade of 2,200 ppm within indicated resource and a further 6.3 Mt LCE contained in 500 Mt of clay at a Li grade of 2,300 ppm within inferred resource. The assays are consistent with our understanding that the Sonora Lithium Project is a high grade and scalable asset which we hope to be able to service increasing global demand for lithium. Over the coming months, we will continue to progress the pre-feasibility study for this exciting asset and look forward to further informing the market as additional updates become available."

(1) The Fleur concession is held by Mexilit S.A. de C.V. ("Mexilit"), a company that is owned 70% by Bacanora and 30% by Rare Earth Minerals PLC ("REM").

(2) LCE is the industry standard terminology for, and is equivalent to, Li2CO3. 1 ppm Li metal is equivalent to 5.32 ppm LCE / Li2CO3. Use of LCE is to provide data comparable with industry reports and assumes complete conversion of lithium in clays with no recovery or process losses.

(3) Values greater than 10,000 ppm Li were cut back to 10,000 ppm.

Table 1. Summary of Lithium-bearing intercepts – La Ventana

-----------------------------------------------------------------------
----
                                                          Weighted
                                               Length   average Li
Hole No   Unit             From (m)   To (m)      (m)          ppm    LCE %
----------=================================================================
LV-18     Upper Clay         218.24   245.67    27.43          577      0.3
          -----------------------------------------------------------------
            including        226.31   230.43     4.12        1,213     0.65
          -----------------------------------------------------------------
          Lower Clay         260.30   279.50    19.20        1,143      0.6
          -----------------------------------------------------------------
            including        274.02   279.50     5.49        2,248      1.2
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-19     Upper Clay          10.24    51.82    41.58          955      0.5
          -----------------------------------------------------------------
            including         16.46    22.40     5.94        1,340      0.7
          -----------------------------------------------------------------
            including         32.92    48.77    15.85        1,595     0.85
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-20     Upper Clay         219.46   252.07    32.61          584      0.3
          -----------------------------------------------------------------
            including        240.49   247.19     6.71        1,284      0.7
          -----------------------------------------------------------------
          Lower Clay         268.35   291.39    23.04        1,618      0.9
          -----------------------------------------------------------------
            including        279.20   289.86    10.67        2,141      1.1
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-21     Upper Clay           8.92    59.74    50.83        1,194      0.6
          -----------------------------------------------------------------
            including         30.96    38.71     7.75        2,264      1.2
          -----------------------------------------------------------------
            including         49.07    59.74    10.67        2,150      1.1
          -----------------------------------------------------------------
          Lower Clay          72.24    92.96    20.73        1,759      0.9
          -----------------------------------------------------------------
            including         80.16    92.96    12.80        2,649      1.4
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-22     Upper Clay          25.91    35.86     9.96        1,339      0.7
          -----------------------------------------------------------------
          Upper Clay          44.50    57.30    12.80        2,643      1.4
          -----------------------------------------------------------------
          Lower Clay          77.40    90.02    12.62        3,915      2.1
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-23     Upper Clay          38.56    53.64    15.10        2,982      1.6
          -----------------------------------------------------------------
          Lower Clay          69.65    85.95    16.20        3,756      2.0
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-24     Upper Clay         101.19   112.17    11.00        1,716      0.9
          -----------------------------------------------------------------
          Upper Clay         116.43   130.02    13.60        2,780      1.5
          -----------------------------------------------------------------
          Lower Clay         145.21   158.88    13.60        4,122      2.2
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-25     Upper Clay         137.72   155.75    18.03        2,199      1.2
          -----------------------------------------------------------------
            including        145.08   154.23     9.14        3,035      1.6
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-26     Upper Clay          30.48    48.77    18.29        2,018      1.1
          -----------------------------------------------------------------
          Lower Clay          59.44    76.05    16.61        2,701      1.4
          -----------------------------------------------------------------
            including         59.44    66.45     7.01        4,203      2.2
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-27     Upper Clay          48.67    66.14    17.48        3,215      1.7
          -----------------------------------------------------------------
          Lower Clay          78.03    98.45    20.42        5,830      3.1
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-28     Upper Clay         138.38   165.93    27.55        2,617      1.4
          -----------------------------------------------------------------
            including        153.62   165.93    12.31        4,306      2.3
          -----------------------------------------------------------------
          Lower Clay         179.83   203.30    23.47        5,228      2.8
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-29     Upper Clay           8.23    35.66    27.43        2,284      1.2
          -----------------------------------------------------------------
            including         24.69    35.66    10.97        3,297      1.8
          -----------------------------------------------------------------
          Lower Clay          51.82    79.25    27.43        4,507      2.4
          -----------------------------------------------------------------
            including         51.82    74.68    22.86        5,395      2.9
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-31     Upper Clay         147.83   185.52    37.69        1,453      0.8
          -----------------------------------------------------------------
            including        173.61   185.52    11.91        2,963      1.6
          -----------------------------------------------------------------
          Lower Clay         203.68   227.38    23.70        2,921      1.6
          -----------------------------------------------------------------
            including        206.65   218.85    12.19        4,174      2.2
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-35     Lower Clay          12.34    33.41    21.06        5,786      3.1
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-36     Lower Clay          15.32    35.36    20.04        4,370      2.3
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-37     Lower Clay          14.81    35.36    20.55        4,105      2.2
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-38     Lower Clay          13.92    37.49    23.57        3,153      1.7
---------------------------------------------------------------------------
---------------------------------------------------------------------------
LV-39     Lower Clay           6.40    26.52    20.12        2,379      1.3
---------------------------------------------------------------------------
---------------------------------------------------------------------------


Table 2. Summary of Lithium-bearing intercepts – Fleur

-----------------------------------------------------------------------
----
                                                          Weighted
                                               Length   average Li
Hole No             Unit   From (m)   To (m)      (m)          ppm    LCE %
---------------------------------------------------------------------------
---------------------------------------------------------------------------
ES-42         Upper Clay      16.15    23.32     7.16        3,107      1.7
              -------------------------------------------------------------
              Lower Clay      39.32    64.62    25.30        4,242      2.3
---------------------------------------------------------------------------


The measurements of the clay units from the drill results were used in the updated mineral resource estimate prepared by SRK Consulting (UK) Limited (as announced by the Company via its news release dated May 13, 2015), however, the assay results were not due to availability.

Carl G. Verley, P.Geo. is the Qualified Person pursuant to National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") and the AIM Note for Mining and Oil and Gas Companies who has reviewed and approved the technical contents of this news release.

ABOUT BACANORA:

Bacanora is a Canadian and London listed minerals explorer . The Company explores and develops industrial mineral projects, with a primary focus on lithium and borates. The Company's operations are based in Hermosillo in northern Mexico and it currently has two significant projects under development in the state of Sonora. The two main assets of Bacanora are:

--  The Sonora Lithium Project, which consists of ten mining concession
    areas covering approximately 100 thousand hectares in the northeast of
    Sonora State. The Company, through drilling and exploration work to
    date, has established an NI 43-101 compliant Indicated Mineral Resource
    of 1.12 Mt LCE contained in 95 Mt of clay at a Li grade of 2,200 ppm and
    an Inferred Mineral Resource of 6.3 Mt LCE contained in 500 Mt of clay
    at a Li grade of 2,300 ppm.; and
--  The Magdalena Borate Project, covering 16,503 hectares in Sonora state,
    Mexico, where the Company's main borate zone, El Cajon, has an Indicated
    Resource (in accordance with NI 43-101) of 1.17 mt of B2O3, at an eight
    percent cut-off grade. The Company has completed a number of measures to
    determine the geological and commercial potential of the project and is
    undertaking a pre-feasibility exercise to determine the economic benefit
    of developing the mine and constructing a processing plant on site in
    order to become a supplier of boric acid.


Reader Advisory

Except for statements of historical fact, this news release contains certain "forward-looking information" within the meaning of applicable securities law. Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information.

Forward-looking information is based on the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking information. Some of the risks and other factors that could cause the results to differ materially from those expressed in the forward-looking information include, but are not limited to: commodity price volatility; general economic conditions in Canada, the United States, Mexico and globally; industry conditions, governmental regulation, including environmental regulation; unanticipated operating events or performance; failure to obtain industry partner and other third party consents and approvals, if and when required; the availability of capital on acceptable terms; the need to obtain required approvals from regulatory authorities; stock market volatility; competition for, among other things, capital, skilled personnel and supplies; changes in tax laws; and the other risk factors disclosed under our profile on SEDAR at www.sedar.com. Readers are cautioned that this list of risk factors should not be construed as exhaustive.

The forward-looking information contained in this news release is expressly qualified by this cautionary statement. We undertake no duty to update any of the forward-looking information to conform such information to actual results or to changes in our expectations except as otherwise required by applicable securities legislation. Readers are cautioned not to place undue reliance on forward-looking information.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the 'La Ventana drillhole location map', please visit the following link:http://media3.marketwire.com/docs/baca0521.pdf

Contacts:
Bacanora Minerals Ltd.
Peter Secker
Chief Executive Officer
[email protected]

Bacanora Minerals Ltd.
Martin Vidal
President
(+52 662) 210-0767



SOURCE: Bacanora Minerals Ltd.

Original Article: http://www.bacanoraminerals.com/news/AIM/pdf/aim_news20150522.pdf

SHARE THIS POST?

Facebook
Twitter
LinkedIn
WhatsApp
Telegram
Email

Maza Drilling is a Mexican company established in 2007 in Mazatlán, Sinaloa. Our Canadian founder, Mr. Guy de Launiere, has over 20 years of international experience managing diverse drilling operations. Maza Drilling strives to compete at the highest levels in terms of recovery, effectiveness, efficiency, and affordability at every project while keeping at the forefront of technology to meet our customer’s needs in this demanding market.